Laserfiche WebLink
ML AML <br /> t11WIFIED PROGRAM CONSOLIDATED FOMF <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br /> that apply) <br /> ALUr J 1.MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.0 HER(Spe 'fy) 490-54b. <br /> LEAK MONITOR MANUFACTURER: d 490-55. MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57. MODEL#(S): p '<6 U 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. �.YES ❑ b.NO 490-60, <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. �.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. j YES ❑ b.NO 490-62. <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL E2.DOUBLE WALL 490-b3 <br /> IF DOUBLE WALL: ,__, 490-64a. <br /> Q� <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: a•LIQUID ❑ b.PRESSURE �,❑__,�c VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS.&,.YES ❑ b.NO 490-64b, <br /> VII. PERIODIC SYSTEM TESTING <br /> 1*4 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-67- <br /> LEAK DETECTIONELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR§2644.1] <br /> _ 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® <br /> It.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490.69x. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.69f. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g. <br /> ElOTHER(Specify): 490-6eb. <br /> 490-69i. <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additionalgents ents here or indicay how ma ag s with dition fo tion on specific monitoring procedures a attached to this plan. 490-71. <br /> 15Y1 KV C(r. Q U . <br /> XI. PERSONNEL RESPONSIBILI ES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2. all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: �L t n �7)/i l 490-72. TITLE:������g 490-73. <br /> NAME: N 490-74. TITLE: rr- 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> NALkj--�,- <br /> REPRESENTING: 1.Tank Owner/ tator []2.F t Owner/O rstor ❑3 Authorized Representative of Owner 490-76. 36 61 <br /> APPLICANT NAME(print: 490-7.. APPLICANT TITLE: ago-79. <br /> I T-7. i <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org <br />