PRODUCT PIPING REPLACEMENT <br />Shell Facility <br />4315 E. Waterloo Rd. <br />Stockton, CA <br />WORK PLAN <br />March 23,2001 <br />Replace all primary and secondary piping for 87 and 92 products. Replace all sump penetration <br />boots. New pipe will match existing. ( A.O. Smith ) <br />REMEDY <br />To ensure compliance with future secondary piping pressure testing requirement, replacing the <br />existing piping is appropriate as this time. <br />The plan is to begin piping replacement on Mach 26, 2001. <br />►YJ OA <br />�i <br />1 � <br />F �,�'1 • •1�. <br />PiD�ud'A14 <br />0-t, <br />T � <br />Slab <br />PSI <br />S-H`kD <br />PK G.. <br />4��>r� <br />l..'v4,� <br />SITE PLAN <br />5 ive Slab <br />�a ° sfPtr c o S4 M 1 <br />?i -3--N pP- a- avQ. <br />