Laserfiche WebLink
8. <br />a. Describe the method that will be utilized to purge and/or Inert the tank(s): <br />�v/,A <br />b. TankMping Hauler: <br />Name---ECS- <br />Address 13 -7 3 c8� s Jo v E2 kv = City Fes; 7g.�-- A Zip 2 3 3,5— <br />Phone <br />.SPhone No.( <br />Hauler Registration # (if hauled as hazardous) 16-33 <br />C. Tank/Piping Disposal Site: <br />Name E G <br />Address 137-38 SLo v ort- ,qy!t City Fz;N,dTA^,A <br />Phone No.( qc 9 )-3�5'-S!F 6 1 <br />Zip 9 2-33.S- <br />EPA <br />.33.S" <br />EPA ID# (if transported to a permitted TSD facility) C A d 478 Zd 3 U J 7,3 <br />9. Is the sampling firm an independent third party from the contractor? YES NO I ] <br />9a. Describe, In detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />PE- k S il,.1--- <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />A <br />11. Handling of excavated soil: <br />a) What material will be used to ' cover the stockpile? <br />'U ;4 1 BIA4-k t/1% Gz0o5` ✓-, <br />b) What will be the final destination of the excavated stockpile? <br />�� I ��i•NA� ✓ <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name E C <br />Hauler Registration # /533 <br />Address 1 3"7 3� .S Lc, y C2 R ✓f- City =N , A, -A <br />Phone No.1 / c q ) 3 s (e'0 1 <br />EH 23 046 (Revised 08/13199) Page 5 <br />Zip 1 2-33 S- <br />