My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date:_ May 13, 199L <br />WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify County of San Joaquin O.E.S. within 30 days of any <br />changes to the monitoring procedures, unless required to obtain approval before making the change. Required by Sections <br />2632(d) and 2641(h) CCR. <br />Facility Name Waterloo Shell 7524-2895 <br />Facility Address 4315 Waterloo Road, Stockton <br />A. Describe the frequency of performing the monitoring: <br />Tank Continuous Electronic Monitoring <br />Piping Continuous monitoring/ mechanical Line Leak Detector. Annually all product line <br />are pressure tested. <br />B. What methods and equipment, identified by name and model, will be used for performing <br />the monitoring: <br />Tank VEEDER ROOT TLS 350 annular space monitor and electronic inventory <br />reconciliation for the product tanks. <br />Piping TLS -350 sump monitor and mechanical line pressure sensor <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan should <br />be attached): <br />The monitor is located in the building. <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment. <br />William Norby / Dealer <br />Irma Salmeron / Manager <br />E. Reporting Format for monitoring: <br />Tank: A written monitoring log. <br />Piping: A written monitoring log and annual certification <br />F. Describe the preventative maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months. <br />The monitoring systems shall be certified annually in accordance with manufacturers <br />recommendations <br />G. Describe the training necessary for the operation of UST system, including piping, and <br />the monitoring equipment: The operators receive initial and annual refresher training in <br />accordance to the manufacturers recommendations Refer to the stations H,S&E green <br />binder. Employee Training Section, located at the cashier counter, for more detailed <br />information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.