My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEAK RESPONSE PLAN <br />'TRODUCTION <br />IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE EQUILON <br />ENTERPRISES, LLC. FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT EQUILON FACILITIES. <br />DESIGN AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER <br />TO REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br />RESPONSIBLE EQUILON PERSONNEL <br />NAME <br />TITLE <br />PHONE <br />William Norby <br />Dealer <br />Day: 209-931-3674 <br />24hr: 209-369-2252 <br />Aura Mattis <br />SH&E Coordinator <br />Office: 510-335-5026 <br />Pager: 800-656-9726 <br />Alex Perez <br />Environmental Engineer <br />Office: 510-335-5027 <br />Pager: 800-462-7512 <br />Brett Hovland <br />Project Engineer <br />Office: 510-335-5032 <br />Pager: 510-840-2426 <br />RESPONSIBLE CONTRACTOR <br />' Services <br />...,36 N. Hazel #108 <br />Fresno CA 93722 <br />800-552-7503 <br />LEAK VERIFICATION <br />WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br />PROCEDURES WILL APPLY: <br />THE EQUILON ENGINEER WILL ARRANGE FOR THE EQUILON TERRITORY MANAGER TO IMMEDIATELY <br />(THE SAME DAY) VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br />INVENTORY RECORDS. <br />2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br />ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br />OPERATION (ON REMOTE SYSTEMS). <br />3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br />SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br />4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br />IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br />MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br />LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br />NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br />5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br />DETERMINE THE LEAK SOURCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.