My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLAT(CH INSPECTICN lEC-M <br />FAC: L:TY NAME: .-� ivs v / f �i / /�k ���.. ADDRESS: <br />FACILITY 101. / U, IANlG: UL: TANK MCOEL/MATaIAL: <br />IC.:PAC'TY: PRCOUCT: d.E.A.S: I <br />INITIAL (15Pcr IONS <br />I i 13. INSP!E TION AND ,=ST CF SECCHOARY =NTAINMENT: HOL:DAY: <br />VAC": SOAP- ?Si: HRS/MIN: 3RINE(L:C3)ID ANNULAR): OTHE.4 <br />j PRIMARY TANK TEST: PS?: HRS/M[N: <br />i I <br />TANK APPROPRIATELY ?ILAC--1 'J(TH APPROVED 3AWILL (API/PEI) <br />PIPING iNSPECTIMS <br />�. <br />A <br />II <br />i. <br />SEr-..N' GARY ?SP!NG (::WTA(AME'IT TEST ?Si: 3RS/MIN:ME.4: <br />? <br />V <br />ALL TANKS TO 3E INSTALLS AND TESTED IN AC=ROANC <br />CCZ.Z 26335 (a) (4)) <br />? <br />i <br />i 'JITH ,MANUFACTURER '+RI�ic1 SPEC::?CATIONS <br />i IiO. <br />.1 <br />7 <br />X11. <br />ALL ??PING AND :iiiiNGS =RROSiON PROTEC7M <br />(C= 2536 (h)) <br />112. <br />PIPING SLC PES TO =L—l.:—CION SUMP <br />=2 2636 C c W) ) <br />V <br />A <br />2635 (h) C2)) <br />I I <br />I <br />—IL <br />Des <br />TANK AC: -SS PORTS 3RCUGHT TO GRADE (LCCED ANO.WTERTIGHT). <br />API <br />I20. <br />TANK MTEMITY TEST (?ASSING HARD COPY) <br />IT= -M OR _-.UIPMEIT (NSPEs M <br />:ATE <br />I21. <br />i <br />MCHITCRING PLAN, RESPONSE ?'LAN AND LOG SOCK ON SITE <br />CCC.Z 2632 (d)) <br />1. UST ?CLANS SUSMIiiiE / =_=S ?AID (4-5 C=E 252371 <br />i <br />2. UST :NSTALLATICN 31 -ANS APPROVED <br />INITIAL (15Pcr IONS <br />I i 13. INSP!E TION AND ,=ST CF SECCHOARY =NTAINMENT: HOL:DAY: <br />VAC": SOAP- ?Si: HRS/MIN: 3RINE(L:C3)ID ANNULAR): OTHE.4 <br />j PRIMARY TANK TEST: PS?: HRS/M[N: <br />i I <br />TANK APPROPRIATELY ?ILAC--1 'J(TH APPROVED 3AWILL (API/PEI) <br />PIPING iNSPECTIMS <br />�. <br />PRIMARY ??P(NG T'cST CM141MW :O ?SI/30 ,MIN) <br />CC= 2536 (e)) <br />i. <br />SEr-..N' GARY ?SP!NG (::WTA(AME'IT TEST ?Si: 3RS/MIN:ME.4: <br />CCI:.Z 2536 (e)) <br />{ I I 3. <br />f <br />LAK- TEST w ALL -SUMPS (24 HR. MINIMUM)' HRS: <br />CCZ.Z 26335 (a) (4)) <br />I 9. <br />UNUSED TANK OP°VINGS 3EALE-3 AND .=RROSICN ?ROTE--=- <br />PE: <br />i IiO. <br />CVEZS?tL ?C-RFCRMANC QST <br />(C:2 635 (h) (1) (C)) <br />X11. <br />ALL ??PING AND :iiiiNGS =RROSiON PROTEC7M <br />(C= 2536 (h)) <br />112. <br />PIPING SLC PES TO =L—l.:—CION SUMP <br />=2 2636 C c W) ) <br />FINAL INSPE1=71CH <br />1 ,' �,:I/i �✓ <br />7 <br />i,� 3. <br />VMl14. <br />PERM MAt1C TEST FL'R "ALL" ,MONITORING ?ROSES <br />(C:1 :632 Cc) (2)) <br />I , fh , ��j I ✓ <br />PeFORMANC TEST OF =MTIN000S MONITORING SYST'c� CPAHEL) <br />CC'. R 2632 Cc) (2) ) <br />2EZFCRMANC TES: OF 1 -INE �1K OEic?.'iION <br />CC -1 2643 (c) (1)) <br />1 l�, I ✓ <br />11 <br />--RFCRMANC EST OF AUTOMATIC ?UMP SYSTEM S;W-OFP <br />CC »Z 2516 (9)) <br />I <br />17. <br />3ALL FLOAT VALVES INSTALLED <br />I18. <br />OVERFILL RROTEC710N INSTALLED/APPROVEDCCI:.Z <br />2635 (h) C2)) <br />I I <br />I <br />!19. <br />i <br />TANK AC: -SS PORTS 3RCUGHT TO GRADE (LCCED ANO.WTERTIGHT). <br />API <br />I20. <br />TANK MTEMITY TEST (?ASSING HARD COPY) <br />(C= 2635 (a) C5)) <br />I21. <br />i <br />MCHITCRING PLAN, RESPONSE ?'LAN AND LOG SOCK ON SITE <br />CCC.Z 2632 (d)) <br />22. <br />"C" FM C2MPL:, i cE AND 3)SM I 77M <br />(C' -.l 205 C d) ) <br />123. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />CC_Z 253(1-2536) <br />! 24. <br />ALL C=ITICNS MET; FAC:L: Y ?ERMIT ISSUED <br />(H -S CODE 25234) <br />MMENTS: <br />H23-306 9/95 <br />ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.