My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certification: <br />Leak Threshold <br />Applicability: <br />California Edition: September 1997 <br />Veeder-Root <br />TLS-3501350PC / 350R / 350RPC Line Leak Detector, Series 8484 <br />AUTOMATIC ELECTRONIC LINE LEAK DETECTOR <br />Leak rate of 0.1 gph with Po=100.0% and PFA=O%. <br />0.05 gph. A leak is declared if the output of the measurement system equals or <br />exceeds this threshold. <br />Gasoline, diesel, aviation fuel, and solvents. <br />Specification: System tests pressurized fiberglass and steel pipelines. <br />Tests are conducted at operating pressure. <br />System will not function with a mechanical line leak detector installed <br />in the pipeline. <br />Pipeline Capacity: Maximum of 98.4 gallons. <br />Waiting Time: None between delivery and testing. <br />Minimum of 2 hours, 30 minutes between dispensing and testing. <br />Test Period: Response time is 18 minutes. <br />Test data are acquired and recorded by a microprocessor. <br />Calculations are automatically performed by the microprocessor. <br />System Features: Permanent installation on pipeline. <br />Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Dispenser shutdown, message display and alarm activation if leak is declared. <br />Calibration: System must be checked annually and calibrated if necessary in accordance with <br />manufacturer's instructions. <br />Veeder-Root Evaluator: Midwest Research Institute <br />125 Powder Forest Dr. Tel: (816) 753-7600 <br />Simsbury, CT 06070-2003 <br />Tel: (203) 651-2700 Date of Evaluation: 08/07/91 <br />280 <br />Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of <br />the method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.