Laserfiche WebLink
BOARD OFTRUSTEES- <br />James Culbertson, Pres. <br />Patricia E. VannuCcl, Secy <br />Anthonette Van Spronsen <br />Earl Plmentei <br />Fern Bupbee <br />Daniel L. Flores <br />John 0. Mast, M.D. <br />William J. Wade <br />Mary Anna Love <br />Facility 14,ime <br />Address <br />SAN -.QUIN LOCAL HEALTH DISTRI( SERVING <br />City of Lodi <br />1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br />City of Escalon <br />Stockton, Callfornla 95201 City of Manteca <br />209/466-6781 City of Ripon <br />City of Stockton <br />City of Tracy <br />Jopl Khanna, M.O., M.P.H., District Health Officer San Joaquin County <br />San Joaquin County <br />Date of Inspection Z Inspector/IC,C,r <br />MONITORING ALTERNATIVE ,#7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liquic' level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />L-� <br />Tank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />�o <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />j Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1 Precision test(s) must be performed by 1,�l and results submitted to this <br />office within 30 days of the test. <br />2 Tank gauging must be started immediately. (See instructions above), <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />