Laserfiche WebLink
Page 5 <br />OUSTOMER: <br />� C <br />SITE PREPARATION AND SYSTEM DATA <br />THREE -TANK SYSTEM <br />DATE: <br />LOCATION NO.: / SYSTEM NO.: — <br />PRODUCT: <br />CITY/STATE: <br />SITE PREPARATION <br />OTHER CONDITIONS <br />VAPOR RECOVERY ❑ PLUGS DgISERSEl� OTHER <br />VENT El NO PREPARATION I�OPEN TO ATMOSPHERE ❑ P -V VALUE REMOVED ❑ OTHER <br />❑ REMOTE/SUBMERSIBLE (DEPTH 1 <br />❑ SUCTION (HEIGHT ) <br />CHECK VALVE <br />STRAINER <br />IMPACT VALVE <br />CHECK VALVE <br />STRAINER <br />SUCTION.CONNECTION <br />❑ REMOVED & OPEN <br />IN PLACE <br />ElCLOSED <br />REMOVED &COVER <br />REPLACED <br />❑ REMOVED <br />/ <br />RJ I1� PLACE <br />el <br />REMOVED &COVER <br />E]REMOVED <br />REPLACED <br />❑ OTHER <br />❑ CLOSED <br />PLUG-IN <br />E]CLOSED <br />PLUG -OUT <br />I --y <br />❑OPEN <br />❑ BURIED <br />❑EXTRACTABLE <br />❑ REMOVED <br />❑ IN PLACE <br />REMOVED & <br />CAP REPLACE <br />❑ REMOVED <br />FI IN PLACE / <br />C-] REP(,/�R:EfI& COVER <br />OTHER <br />/- ❑ UNION <br />❑ COUPLING <br />WITH FOIL <br />❑OPEN NO FOIL <br />�_7 <br />U IN PLACE <br />❑ OTHER <br />4 <br />r❑ <br />u OTHEB,✓ <br />❑ OTHER <br />AVERAGE <br />T <br />❑ C <br />❑ OTHER <br />TC = <br />CC'S <br />Q ,,jDIVISION <br />TAN?2M <br />TEST 1 DATA <br />TANK 1 TANK 2 TANK 3 <br />LOCATION DROP TUBE LOCATION DROP TUBE _ LOCATION DROP TUBE <br />e FILL Gauge other (Specify) IN OUT Non FILL Gauge Other (specify) IN OUT None <br />FILL Gauge Other (Specify) IN OUT Non <br />T. PROBE - <br />BALANCE <br />LEVELS <br />Time Tank 1 Tank 2 <br />START O� <br />END <br />LEAK RATE iLR)AL ULA N <br />LR = <br />±A DIVISIONS X CALIBRATION, CC = CC IN OUT <br />MINUTE DIVISION MINUTE <br />LR = —4— I 1 3 � z <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF EXPANSION <br />1/ �F <br />CALIBRATION <br />3785 GT CE D*F <br />CC <br />LOCATION <br />� <br />METHOD p -j <br />'IJ <br />SOLID ROD <br />❑ LIQUID <br />OR <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />AVERAGE <br />T <br />❑ C <br />❑ OTHER <br />TC = <br />CC'S <br />Q ,,jDIVISION <br />TAN?2M <br />r, <br />TANK 1 <br />TANK 2 <br />TANK 3 TOTAL <br />SYSTEM CAPACITY, GALLONS <br />oTemp. <br />J <br />Differential'TCT <br />- <br />Time of Temp. <br />AVG. CC'S/DIV <br />3. <br />--- <br />Differential, Min. <br />LEAK RATE iLR)AL ULA N <br />LR = <br />±A DIVISIONS X CALIBRATION, CC = CC IN OUT <br />MINUTE DIVISION MINUTE <br />LR = —4— I 1 3 � z <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF EXPANSION <br />1/ �F <br />`fir= <br />3785 GT CE D*F <br />CC <br />IN OUT <br />GRAVITY TEMPERATURE,�F <br />TC = <br />TIME <br />- <br />MINUTE <br />OR <br />SOURCE ❑T159C <br />❑ A ❑ D <br />❑ B ❑ E <br />❑ CHART <br />❑ PUBLISHED DATA AT 60OF <br />❑ C <br />❑ OTHER <br />TC = <br />TANK 1 <br />TAN?2M <br />r, <br />TANK 1 <br />TANK 2 <br />TANK 3 TOTAL <br />SYSTEM CAPACITY, GALLONS <br />oTemp. <br />Differential'TCT <br />Time of Temp. <br />/ <br />--- <br />Differential, Min. <br />ABSOLUTE LEAK RATE (ALR) CALCULATION <br />'A <br />ABSOLUTE LEAK RATE _ "+ TEMP. COMPENSATION `C/ <br />L TE - <br />� � � � 1989 <br />X 0.015852 " - <br />CC/MIN GAL/HOUR <br />❑ IF ALR > ± 0.05 GPH, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) <br />❑ A CHECK TEST WAS NOT CONDUCTED. - <br />• 60 MINUTES/HOUR T 3785 CC/GALLON = 0.015852 <br />