Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> Item Task Status Comments <br /> c.Make sure fusible ❑Yes E No* /A <br /> element is in place <br /> and correctly <br /> positioned. <br /> d. Be sure test ports ❑Yes [No*011A <br /> are seated with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of Ales E]No- N/A <br /> leak detection equipment, including: <br /> equipment • The window is <br /> clean and clear in <br /> sight teak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> applicable. <br /> 5.4 Spill a. If corrosion, ❑Ye s*E b'o /A <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions, <br /> replace the unit <br /> b.Inspect the E]Yes*E]Vo 1A <br /> connections to the <br /> AST for tightness,as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessary. <br /> c.Drain valves must []Ye s <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the []Yes ENo* /A <br /> strainer is clean and in <br /> good condition. <br /> AST INSPECTION STANDARD PAGE 4 OF 6 SEPTEMBER 2011 <br /> i <br /> i <br />