Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> Item Task Status Comments <br /> 2.3 Supports Check for corrosion, ❑Yes*❑No❑N/A <br /> paint failure,etc. <br /> 2.4 Water Water drains away ❑fes❑No*❑N/A <br /> drainage from tank? <br /> 2.5 Tank Strap secured and in Qfes❑No*❑N/A <br /> grounding good condition? <br /> 3.0 Cathodic Protection <br /> 3.1 Gavlvanic Confirm system is ❑fes❑No*❑N/A <br /> cathodic functional,includes the <br /> protection wire connections for <br /> system galvanic systems <br /> 3.2 Impressed a. Inspect the Eyes❑Vo*❑N/A <br /> current operational <br /> system components(power <br /> switch, meters,and <br /> alarms). <br /> b.Record hour meter, ❑Yes dJa*a/A <br /> ammeter and <br /> voltmeter readings. <br /> 4.0 Tank Shell, Heads, Roof <br /> 4.1 Coating Check for coating ❑Yes*❑No <br /> failure <br /> 4.2 Steel Check for: ❑Yes*❑No <br /> condition • Dents <br /> Buckling <br /> • Bulging <br /> • Corrosion <br /> • <br /> Cracking <br /> 4.3 Roof slope Check for low points ❑Yes*❑No❑N/A <br /> and standing water <br /> 5.0 Tank Equipment <br /> 5.1 Vents Verify that ❑Yes*❑No <br /> components are <br /> moving freely and vent <br /> passageways are not <br /> obstructed for: <br /> • Emergency vent <br /> covers <br /> • Pressure/vacuum <br /> vent poppets <br /> • Other moving vent <br /> components <br /> AST INSPECTION STANDARD PAGE 2 OF 6 SEPTEMBER 2011 <br />