Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> Item Task Status Comments <br /> c. Make sure fusible ❑Ye s ao*QJ/A <br /> element is in place <br /> and correctly <br /> ositioned. <br /> d.Be sure test ports ❑Yes ❑ t,*❑J/A <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve. <br /> 5.3 Interstitial Check condition of ❑fes❑No*❑N/A <br /> leak detection equipment, including: <br /> equipment . The window is <br /> clean and clear in <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button,if <br /> applicable. <br /> 5.4 Spill a. If corrosion, ❑Ycs*Uo ❑N/A <br /> containment damage,or wear has <br /> boxes on fill compromised the <br /> pipe ability of the Unit to <br /> perform spill <br /> containment functions, <br /> replace the unit. <br /> b. Inspect the ❑Yes*Uo EN/A <br /> connections to the <br /> AST for tightness,as <br /> well as the bolts, <br /> nuts,washers for <br /> condition and replace <br /> if necessary. <br /> c. Drain valves must [--]Yes*Ovo ❑4/A <br /> be operable and <br /> closed <br /> 5.5 Strainer a.Check that the ❑Ye s ❑vo*[T/A <br /> strainer is clean and in <br /> ood condition. <br /> AST INSPECTION STANDARD PAGE 4 OF 6 SEPTEMBER 2011 <br /> # t <br />