Laserfiche WebLink
Paz Tire <br />Facility No 39 -TI -0884 <br />Page 4 of 4 <br />(F) The site shall be designed and constructed to provide protection to bodies of water from runoff of <br />pyrolytic oil resulting from a potential tire fire. <br />Summar•: The operator needs to abide by all of the standards set forth in 30 PRC and 14 CCR. <br />