Laserfiche WebLink
NVELL MONITORING DATA SHEET <br />• Project # - Client - 1 -Ir <br /> C3' - A c L <br /> Sampler �✓ Start Date r ci <br /> Well x D r_ Well Diameter (circle one) (32 3 4 6 <br /> Total Well Depth Depth to Water. <br /> Before rLel OL After Before 7 After <br /> Depth to Free Product* Thickness of Free Product (feet) . <br /> Measurements referenced to- V Grade Other: <br /> Well Diameter VCF Well Diameter VCF <br /> 2 ,0 16 g" 1. 1.47 <br /> *1 2.61 <br /> 3" 0 37 10" 4 08 <br /> 4" 0 65 12" 5 87 <br /> 5" 1 02 16" 10.43 <br /> Z: O x <br /> 1 Case Volume Specified Volumes - gallons <br /> Purging Bailed Sampling- Bailer-- <br />• Disposable Bailer Disposable Bailer <br /> Middleburg Extractson Port <br /> Electric Submersible Other <br /> Extraction Pu= <br /> Other <br /> TIME IE&P. pH COND. TURBIDITY: VOLUMM OBSERVATIONS: <br /> F REMOVED <br /> L-1 6 5-t !_ 25 7-?- 7 2 445 'j <br /> 15,70 R}'rZ 7.3 <br /> Did well Dewater' � If yes, gals Gallons Actually Evacuated: �'�� <br /> Sampling Time: IS 3 7 Sampling Date a _nZ-, 15' <br /> Sample X.D. : ! Laboratory: <br />. Analyzed for: TPH-G TPH-D OTHER: <br /> (Circle) <br /> Duplicate Y.D. • Cleaning Blank Y.D. : <br /> Analyzed for: TPH-G BTEX TPH-D OTHER: <br /> (Circle) <br />