My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANGUINETTI
>
1996
>
1900 - Hazardous Materials Program
>
PR0544610
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 9:58:00 AM
Creation date
8/30/2019 10:28:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544610
PE
1920
FACILITY_ID
FA0025357
FACILITY_NAME
BEELINE SPEED AND MACHINE
STREET_NUMBER
1996
STREET_NAME
SANGUINETTI
STREET_TYPE
LN
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1996 SANGUINETTI LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u Workplace Safety <br /> • INFORMATION <br /> & Prevention Services® Oj <br /> MACHINE SAFETY <br /> Inspection And Maintenance <br /> For the machinery,guards, and your entire work area, regularly and often. <br /> Emergency Preparation and Regular Drills <br /> To be prepared and able to respond effectively to unexpected occurrences. <br /> Human Factor Planning <br /> To allow you regular relief and change from repetitive tasks on production lines,to avoid fatigue, strains, <br /> sprains, and other injuries or accidents through regular breaks and task variety. <br /> Training <br /> WHMIS and chemical health and safety, inspecting your workplace and housekeeping, emergency <br /> response. <br /> Lockout Procedure <br /> A proper lockout procedure has seven steps: <br /> 1. Prepare for shutdown:gather required materials, notify appropriate personnel. <br /> 2. Shut down the equipment:Disconnect power/shut down (electricity,gravity, air/fluid/steam <br /> pressure, springs or mechanical). <br /> 3. Isolate the equipment: Isolate the system from all energy sources. <br /> 4. Attach locks/locking devices and tags: Sign and attach warning tag(s). <br /> 5. Control stored energy:Use safety blocks between dangerous parts that could move and injure. <br /> Dissipate any stored energy. <br /> 6. Verify isolation of equipment:Test controls to see that the machine can't go and has no built-up <br /> energy left. <br /> 7. Release from lockout control: This will ensure safe return to service for all workers. <br /> Job/Task Analysis <br /> Job/task analysis provides a process for developing actual working procedures - how the job is <br /> performed -with appropriate controls in place for health, safety and environmental protection. <br /> �O 330-013-02-IGDO©2013,Workplace Safety&Prevention Services(WSPS) <br /> 1 877 494 WSPS(9777)1 905 614 1400 1 www.wsps.ca <br />
The URL can be used to link to this page
Your browser does not support the video tag.