Laserfiche WebLink
CONSTRUCTION DOCUMENTS FOR : <br /> PO BOX 1664 <br /> NEW TANAC(714) 6- WA 96221 <br /> (714) 856-1105 <br /> KATRINA RIDDLE <br /> PROJECT MNGR <br /> KATRINAOMJCDESIGNINC.COM <br /> BURGER KING RESTAURANT <br /> i LANCE BRowN, AIA <br /> ------------ <br /> - SAN JOAQUIN COUNTY <br /> - <br /> __ ENVIRONMENTAL HEALTH DEPARTMENT STAMP: <br /> 1868 E. HAZELTONAVE. <br /> STOCKTON, CA 95205 <br /> 2600 R RANCH RD (209)468-3420 * N <br /> o�pro�ed 5 <br /> o <br /> , i, „ , a _�ffIIllII>�pI - ITF77rtfis!"� APProved,with changes See.RemaYkS -a <br /> )3�1 , r PAD 10 SUITE 100 Disapproved See Re rks �� o o <br /> Remarks tea ?�l oC� A <br /> _ -19 <br /> -__ <br /> LODICA 6a <br /> t yo� Approval extends only to the wfich is shown 2dscribed <br /> -y BALI 61TE PLA hereon and does not authorize or approve any omission or <br /> INCLUDES TENANT IMPROVEMENT OF NEW BURGER KING ONLY AP N : 058- 650-06 deviation from requirements of state laws or local ordinances. <br /> (ALL OTHER BY CENTER) <br /> GENERAL NOTES PLANS PREPARED FOR BUILDING CODES DRAWING INDEX <br /> 1. ALL WORK SHALL COMPLY WITH THE STANDARDS OF THE 2016 CBC. QUIKSERVE/SUNNY GHAT <br /> 25 E.AIRWAY AVE. <br /> LIVERMORE, CA 98441 BUILDING CODE 2016 CBC T-1 TITLE SHEET <br /> 2. ALL WORK SHALL COMPLY NTH THE REQUIREMENTS OF THE 2016 CBC, <br /> 2016 CMC'2016 CPC,2016 CEC'2016 CFC OCCUPANCY GROUP: A-2 8T-1 SITE PLAN ja"o- noU <br /> C2.0 CENTER SITE PLAN (FOR REFERENCE ONLY) <br /> 3. NAILING SHALL CONFORM WITH THE REQUIREMENTS OF CHAPTER 23 OF THE 2001 IRC UNLESS USE: RESTAURANT <br /> NOTED OTHERWISE. THE NAILING REQUIREMENTS IN CHAPTER 23 SHALL BE CONSIDERED ASPROJECT DIRECTORY AD-2 ACCE8818LITY DETAILS <br /> MINIMUM REQUIREMENTS. OTHER NOTES AND DETAILS WITHIN THE PLANS MAY REQUIRE MORE FLOOR AREA: 2500 SF AD-3 ACCE8818LITY DETAILS <br /> STRINGENT REQUIREMENTS. no <br /> AD-4 ACCE88INILITY DETAILS SUBMITTAL DATE <br /> 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES BUILDING DESIGNER,MJc DESIGN INC DALE CHRISTIAN ENGINEERS TYPE OF CONSTRUCTION: V-N PLANNING DEPT: <br /> AND SHALL CHECK ALL DIMENSIONS. ANY DISCREPANCIES SHALL BE CALLED TO THE A-1 PROPOSED FLOOR PLAN KATELLA#107 CA 1744 S. - <br /> ATTENTION OF THE DESIGNER AND SHALL BE RESOLVED BEFORE PROCEEDING WITH THE WORK. SANTA ANA, BUILDING; DEPT: <br /> THE BUILDING OFFICIAL SHALL APPROVE ANY CHANGES TO THE APPROVED PLANS BEFORE ANACORTES, WA ORANGE, CA 92867 FIRE SPRINKLER SYSTEM: NO A-1.1 FLOOR PLAN DETALS ENGINEERING: - <br /> PROCEEDING WITH THE NEXT PHASE OF WORK. PH: 714-856-1105 PH: 714-997-1145 A-2 PROPOSED REFLECTED CEILING AND SEATING PLAN SURVEY: <br /> 5. ALL NOTES THROUGHOUT THIS PLAN SET APPLY TO ALL SHEETS WHERE APPLICABLE. ATTN: KATRINA RIDDLE CONTACT: RICHARD PARKING PROVIDED: 68 A-3 EXTERIOR ELEVATIONS (FOR REFERENCE ONLY) - <br /> KATRINA@MJCDESIGNINC.COM A-4 FLOORING AND WALL FINISHES PLAN <br /> 6. ARE NOT S INDICATE GENERAL AND TYPICAL DETAILS R CONSTRUCTION. WHERE CONDITIONS A-5 ...ENLARGED RESTROOM AND INTERIOR ELEVATIONS REVISIONS <br /> ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, FIRE DEPT. NOTES OCCUPANCY LOAD: 81 A-8 FINISH SCHEDULES <br /> SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED. A-8.1 SECTIONS AND DETAILS No. Description pate <br /> 7. DRAWING MAY NOT ALWAYS BE TO SCALE. NOTED DIMENSIONS SHALL TAKE PRECEDENCE. A-10 DOOR AND WINDOW SCHEDULE <br /> SUBMIT PLANS TO AND OBTAIN PERMIT FROM FIRE PREVENTION A-11 MANUFACTURERS LIST <br /> ATFORTHE CONTRACTORS NOTES: Ea-1 EQUIPMENT PLAN <br /> INSTALLATION OR MODIFICATION OF FIRE SPRINKLER SYSTEM. INSTALLATION MUST <br /> ALSO COMPLY WITH FFD POLICY SECTION 405. FFD POLICIES CAN BE FOUND ON THE <br /> FIRE DEPARTMENT WEBPAGE UNDER FIRE PREVENTION& INVESTIGATION, FIRE DEPT. A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL DRAWINGS AND <br /> SPECIFICATIONS , INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, CIVIL, $(�`-1 SIGNS AND CANOPY'S <br /> CONSTRUCTION MATERIALS (IF APPLIES) OBTAIN PERMIT FROM FIRE PREVENTION DEIVISION (OVER THE COUNTER)FOR FIRE STRUCTURAL, MECHANICAL, PLUMBING,AND ELECTRICAL PRIOR TO SUBMITTING A <br /> BID. REPORT ANY DISCREPANCIES TO ARCHITECT OR ENGINEER PRIOR TO BID AND 8-1 SOFFIT DETAILS J <br /> SPRINKLER ALARM SUPERVISION. SUPERVISION IS REQUIRED ON ALL FIRE SPRINKLER DURING CONSTRUCTION, BY SUBMITTING RFI. <br /> 1. CONCRETE AT 28 DAYS:FOOTINGS AND FOUNDATION WALLS ARE DESIGNED FOR 2500 PSI SYSTEMS WITH 20 OR MORE SPRINKLER HEADS.2016 CFC, SECTION 903.4. INSTALLATION B. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISTING W <br /> PROVIDE 3000 PSI CONCRETE FOR QUALITY CONTROL. NO SPECIAL INSPECTIONS OR TESTING REQUIRED. MUST ALSO COMPLY WITH FFD POLICY SECTIONS 405 AND 407. FFD POLICIES CAN BE CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE M-1 HVAC PLAN AND SCHEDULE <br /> 2. REINFORCING GRADE: 60 KSI FOUND AT HTTPJ/WWW.FRESNO.GOV/FIRE/FIRE-PREVENTION-INVESTIGATION/ WORK.THE SUBMISSION OF A BID WILL BE EVIDENCE THAT SUCH AN EXAMINATION M-2 HVAC ROOF PLAN 13Q <br /> 3. MASONRY: Fc MIN.= 1900 PSI DEVELOPMENT-POLICIES/ HAS BEEN MADE. LATER CLAIMS FOR LABOR,EQUIPMENT, OR MATERIALS REQUIRED, M-3 HOOD PLANS <br /> 4. STRUCTURAL STEEL: REGULAR SECTIONS ARE FY=50 KSI;TUBE STEEL IS FY=46 KSI OR FOR ANY DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN M-4 HOOD PLANS W <br /> S. BOLTS FOR STEEL USE A325 <br /> HAD AN EXAMINATION BEEN MADE, WILL NOT BE ALLOWED. M-5 HOOD PLANS W <br /> DESIGN STANDARDS C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT, M-6 HOOD PLANS <br /> 6. BOLTS FOR LUMBER USE A307(GRADE 2) LANDLORD, OR TENANT OF ANY DISCREPANCIES ENCOUNTERED ON THE PLANS OR M-7 HOOD PLANS <br /> 7. 02 DOUG FIR FB=875 PSI, FC= 1300 PSI, FV=95PSI, E- 1.6E6PSI IN EXISTING SITE CONDITIONS PRIOR TO SUBMISSION OF BID. <br /> S. #1 DOUG FIR FS- 1200 PSI, FC= 1000 PSI, FV= 85 PSI, E= 1.6E6 PSI D. CONTRACTOR, DURING PRE-BID SITE VISIT, SHALL TAKE NOTICE OF ANY VISUALLY M-8 HOOD PLANS <br /> DESIGN PHASE DESIGN REVIEW. M-9 HOOD PLANS Z <br /> 9. PLYWOOD/OSB SINS C-CIt;,-D PER PLANS APPARENT CODE VIOLATIONS AND ALLOW IN HIS/HER BID FOR CORRECTING SUCH <br /> 10. PLYWOOD ROOF 1 1/4-,411124 1. DESIGN REVIEWER REQUIREMENTS. FOR BUILDINGS LESS THAN 10,000 SQUARE FEET, VIOLATIONS. M-10 HOOD PLANS _ <br /> M-11 DUCT DETAILS CONTRACTORS ARE CAUTIONED TO COORDINATE ITEMS IN THEIR SCOPE OF WORK <br /> 11. PLYWOOD/OSB FLOOR 3/4",48/24 DESIGN PHASE DESIGN REVIEW MAY BE COMPLETED BY THE DESIGN ENGINEER. E. <br /> WITH OTHER TRADES. P-1 SANITARY AND GREASE WASTE PLAN <br /> 12. GL BEAMS: 24F V4 IN SIMPLE BENDING OR V8 IN DOUBLE BENDING F INDICATED BUILDINGS BETWEEN 10,000 AND 50,000 SQUARE FEET REQUIRE COMPLETION OF THE Z <br /> � ) F. THESE NOTES APPLY TO ALL SHEETS. P-2 WATER AND GAS PLAN Q <br /> 13. MICROLAM (LVL) TRUSJOIST MACMILLAN PRODUCTS, E= 1.9E6 PSI DESIGN REVIEW CHECKLIST BY EITHER AN ENGINEER IN+IOUSE TO THE DESIGN FIRM G. BIDDERS TO INCLUDE ALL WRITTEN SCOPE OF WORK LISTED IN THE"FACILITIES P-3 ISOMETRIC <br /> SOILS CRITERIA G <br /> BUT NOT ASSOCIATED WITH THE BUILDING PROJECT, OR A THIRD PARTY DESIGN INSPECTION REPORT"PROVIDED BY THE OWNER. E-1 LIGHTING PLAN <br /> ENGINEER. FOR BUILDINGS LARGER THAN 50,000 SQUARE FEET OR FOR BUILDINGS <br /> 14. 1000 PSA, PER CBC E-1.1 LIGHTING SCHEDULE �- <br /> WITH COMPLEX MECHANICAL SYSTEMS,AN INDEPENDENT, REVIEW OF THESE E-2 POWER PLAN <br /> 15. MIN. BEARING DEPTH: 1'-0"BELOW FINISHED GRADE DOCUMENTS BY A THIRD PARTY DESIGN ENGINEER IS REQUIRED. E-3 ELECTRICAL PANEL AND RISERS H <br /> 18. MIN. FOOTING WIDTH: 18" <br /> 2. DESIGN REVIEW. DURING THE SCHEMATIC DESIGN PHASE OF THE BUILDING PROJECT, VICINITY MAP E-4 TECHNOLOGY PLAN W Z O <br /> THE OWNER OR OWNER'S REPRESENTATIVE, DESIGN TEAM AND DESIGN REVIEWER E-5 MASTER CONTRACTOR PANEL Uj <br /> MUST MEET TO DISCUSS THE PROJECT SCOPE, SCHEDULE AND HOW THE DESIGN - $I( #finneg" E-6 ENERGY CODE COMPLIANCE = Y }• <br /> NEENEWINIM <br /> REVIEWER WILL COORDINATE WITH THE PROJECT TEAM.THE BUILDING OWNER OR �: I>i (o W - Q <br /> REQUIRED SUBMITTALS (UNDER SEPARATE PERMIT) <br /> OWNER'S REPRESENTATIVE SHALL INCLUDE THE DESIGN REVIEW CHECKLIST r a W cc (, <br /> COMPLIANCE FORM IN THE CERTIFICATE OF COMPLIANCE DOCUMENTATION(SEE ,ax=TIS '. J r _ <br /> 1. SIGNAGE. SECTION 10-103). * M $?E��x g S � y Cr.AI <br /> O 0 Q <br /> 2. FIRE SPRINKLERS OF REQUIRED) 3.CONSTRUCTION DOCUMENTS DESIGN REVIEW.THE CONSTRUCTION DOCUMENTS °"` uaaa $ CENTER PLANS FOR REFERENCE ONLY ~ C0 < 0 <br /> f H to a a <br /> 3 DESIGN REVIEW COMPLIANCE FORM LISTS THE ITEMS THAT SHALL BE CHECKED BY "' +� <br /> THE DESIGN REVIEWER DURING THE CONSTRUCTION DOCUMENT REVIEW.THE "" °1° Lf ° ' � 1 <br /> 4. COMPLETED FORM SHALL BE RETURNED TO THE OWNER AND DESIGN TEAM FOR #;A1 I <br /> REVIEW AND SIGN-OFF.THE BUILDING OWNER OR OWNER'S REPRESENTATIVE SHALL N /Ar " s m ,, f t � �iS A AA11 CENTER SITE PLAN (FOR REFERENCE ONLY) M. <br /> NOTE: INCLUDE THIS CONSTRUCTION DOCUMENTS DESIGN REVIEW COMPLIANCE FORM IN # ;91 s =,'. " s <br /> µ, k K A I 9 AA2.1 BUILDING SHELL DRAWING (FOR REFERENCE ONLY) DATE:- 2-28-18 <br /> ALL DEFERRED SUBMITTALS MUST BE FIRST SUBMITTED TO ENGINEER OF THE CERTIFICATE OF COMPLIANCE DOCUMENTATION (SEE SECTION 10-103). amu;- 4, - , ,l,p 7 §k 3 ' ^ <br /> RECORD FOR REVIEW AND COORDINATION,AND MUST BE FOUL TO BE A$2.2 CENTER STRUCTURAL ROOF PLAN (FOR REFERENCE ONLY) <br /> ACCEPTABLE WITH NO EXCEPTIONS, PRIOR TO SUBMITTING THEM TO THE COMMISSIONING MEASURES SHOWN IN THE CONSTRUCTION DOCUMENTS. INCLUDEM EE3.1 ELECTRICAL SITE PLAN (FOR REFERENCE ONLY) <br /> CITY. COMMISSIONING MEASURES OR REQUIREMENTS IN THE CONSTRUCTION DOCUMENTS 4 " � f SCALE. <br /> eMIM ,�� L2 LANDSCAPE PLAN (FOR REFERENCE ONLYI <br /> (PLANS AND SPECIFICATIONS). COMMISSIONING MEASURES OR REQUIREMENTS SHOULD <br /> BE CLEAR, DETAILED AND COMPLETE TO CLARIFY THE COMMISSIONING PROCESS.THESE •p <br /> SPECIAL INSPECTIONS (IF APPLIES) REQUIREMENTS SHOULD INCLUDE THE LIST OF SYSTEMS AND ASSEMBLIES JOB CAPTAIN: <br /> COMMISSIONED, TESTING SCOPE, ROLES AND RESPONSIBILITIES OF CONTRACTORS, <br /> REQUIREMENTS FOR MEETINGS, MANAGEMENT OF ISSUES, THE COMMISSIONING <br /> SCHEDULE, OPERATIONS AND MAINTENANCE MANUAL DEVELOPMENT AND OF TRAINING, _• k SCOPE OF WORK JOB NUMBER: <br /> AND CHECKLIST AND TEST FORM DEVELOPMENT, EXECUTION AND DOCUMENTATION. <br /> INCLUDE, FOR INFORMATION ONLY, ROLES OF NONCONTRACTOR PARTIES. If <br /> SHEET: <br /> INTERIOR TENANT IMPROVEMENT INCLUDING IMPROVEMENT AS RESTAURANT SPACE, _ <br /> ws .tie <br /> INTERIOR DECOR, FIXTURES AND FINISHES. <br /> - o: <br />