EXISTING PACKAGE ROOFTOP UNIT SCHEDULE CONTRACTORS NOTES <br /> HVAC CONTRACTOR <br /> (FOR REFERENCE ONLY) 1. HE HVAC CONTRACTOR SHALL FURNISH AND INSTALL HE HVAC SYSTEM AS SHOWN IN HE NCA HVAC <br /> EQUIPMENT PACKAGE NOTE, HIS SHEET. <br /> T 2. THE HVAC CONTRACTOR SHALL INSTALL THE EXHAUST HOOD. REFER TO MOST RECENT KITCHEN PLANS <br /> MANUFACTURERR ON SITE. INSTALL ALL EXHAUST DUCT PER MANUFACTURERS INSTALLATION INSTRUCTIONS, SEE SHEET M-3. <br /> MODEL 0 7 VERIFY LOCATION ON SITE WITH MOST RECENT KITCHEN EQUIPMENT PLAN. <br /> LOCATION. UR I OF " 4 MM/HRTYPE 3. SHIMS SHALL BE PROVIDED BY HVAC CONTRACTOR BETWEEN THE ROOF DECK AND THE CURB AS <br /> TOTAL COOLING'F T 89. NEEDED TO COMPENSATE FOR ROOF PITCH. <br /> SENSIBLE COOLING, 62.3 4. ALL FLEX DUCT SHALL BE FOIL-BACKED, R-8, U.L. LISTED, CLASSIFIED AS A CLASS 1 AIR DUCT, AND <br /> ENTERING F W F 95 MEET LOCAL CODE REQUIREMENTS. ROBISON <br /> AMBIENT AIR T 9 5. EXCLUDING ANY EXPOSED DUCTWORK, ALL NON-FLEXIBLE DUCT AND ALL AIR DISTRIBUTION DEVICES <br /> SUPPLY IR F SHALL BE INSULATED WITH R-6, 2" X .75 DENSITY FOIL-BACKED INSULATION, WITH FIRE AND SMOKE <br /> EXTERNAL Ar 4 RATING [25]-[50].HP ENGINEERING, INC <br /> �- 0 6. ALL DUCTWORK SHALL BE INDEPENDENTLY HUNG FROM STRUCTURAL MEMBERS 19401 40TH AVE W.,SUITE 302 <br /> G R 11 7. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED PER SMACNA LOW-VELOCITY DUCT MANUAL LYNNWOOD,WA 98036 <br /> - - <br /> OGAS <br /> UTPUT (LATEST ISSUE). 206-364,3343 TEL <br /> ! I - ; -- '--- --- �'� i1 r � UNIT W I LBS. 9 8. UNLESS OTHERWISE NOTED, EVERY SUPPLY TAP COLLAR SHALL HAVE A LOCKING MANUAL VOLUME <br /> I H DAMPER. CONTACT:MARK MANGLICMOT <br /> MINIMUM CIRCUIT AMPERAGE9. HE HVAC CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS ON SITE WITH THE MOST RECENT <br /> REFLECTED CEILING PLAN. <br /> ACCESSORIES <br /> 1. 100% ECONOMIZER WITH BAROMETRIC RELIEF 10. THE HVAC CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE COVERING A ONE-YEAR PERIOD FOR <br /> -- - 2. SMOKE DETECTOR ALL EQUIPMENT AND AN ADDITIONAL FOUR-YEAR PERIOD FOR THE COMPRESSORS IN THE AIR STAMP: <br /> I ' <br /> CONDITIONING UNITS. <br /> r 400 _,, 11. UPON COMPLETION OF PROJECT THE HVAC CONTRACTOR SHALL HIRE AN A.A.B.C. OR N.E.B.B. OF SS/ <br /> CERTIFIED, <br /> OFNALLEHVACTTEST AND EQUIPMENT. PROVIDE A WRITTEN CE COMPANY TO CONDUCT A REPORT TO NCA CONSUL ANS. ALL CAPACITIES <br /> CERTIFIED TEST AND e D• Rpa 9�F <br /> FAN SCHEDULE MUST BE SET TO AMOUNTS INDICATED ON HE FLOOR PLANS AND SCHEDULES. J'Oyyc� <br /> , <br /> 12. ALL FANS SHALL BE U.L. LISTED. <br /> � I <br /> TAG EF-1 F- F-3 w No. U-28 m <br /> MANUFACTURER COOK COOK COOK 13. THE HVAC CONTRACTOR SHALL VERIFY LOCATIONS OF THE EXHAUST HOOD AND EF-1 FROM MOST c _ <br /> 7'-7 BROILER - MODEL 120CPS-BK100CPS-BK7 H RECENT KITCHEN EQUIPMENT PLANS ON SITE. t J=XF <br /> OVEN HOOD 8"0 DUCT UP TO _ A ROOF ROOF ROOF 14. HVAC CONTRACTOR IS TO MAKE ALL LOW-VOLTAGE WIRING FINAL CONNECTIONS FOR ALL HVAC 1 Q <br /> 10"0 DOUBLE LINED _.. .. -- Tq pHAN\" <br /> EF-3 (ON ROOF") AREA ED BROILER FRYERS R EQUIPMENT INCLUDING SENSORS, THERMOSTATS, AUDIO-VISUAL ANNUNCIATORS, ROOF-TOP UNITS, SMOKE lac 04� <br /> GREASE DUCT UP TO -- II » + DETECTORS, CONTACTOR PANEL, AND CONTROL PANEL. OF CAL\F <br /> 10"0 DOUBLE LINED CFM lloo 800 0 <br /> 10" METAL FAB - EI-1_ (Ohl ROOF) __ GREASE DUCT UP TO STATIC PRESSURE, 1.8 " .5` 5 <br /> DOUBLE LINED DUCT, " F HORSEPOWER 1.0 GENERAL CONTRACTOR 03/01/18 <br /> --- ' 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RECEIVE, OFFLOAD, AND STORE ALL HVAC <br /> 3G SERIES TO HOOD - 1p�1 EES (ON ROOF) <br /> ---- 1 ' N FAN 1957 7 1500 <br /> MATERIALS WHICH ARRIVE AT HE JOB SITE HOODS MUST BE STORED IN HE KITCHEN <br /> r 10$ t__- - 75 75 DRIVE BE DIRECT <br /> --- ELECTRICAL REQUIREMENT, V 208-2 6 208- 1 1 6 2. IT IS VERY IMPORTANT THAT ACCURATE MEASUREMENTS ARE USED WHEN LOCATING EXHAUST FAN ROOF <br /> - 12$ ` - <br /> ' --- A A OPENING TO ENSURE THAT NO OFFSETS ARE REQUIRED IN HE EXHAUST DUCTWORK FROM HE KITCHEN <br /> 1----� --------L----------- 400 C C <br /> - <br /> ROOF OPENING. INCHES 22 2 2 X 1 X HOOD. COORDINATE ROOF OPENINGS WITH THE KITCHEN EQUIPMENT PLAN AND EXHAUST HOOD PLANS. <br /> � ROOF CURB YES YES YES OBTAIN THE CORRECT PLANS FROM HE KITCHEN EQUIPMENT SUPPLIER. <br /> 50 50 BACKDRAFT DAMPER NO I YES <br /> 10$ -- ---'---��� ,9 s BIRDS REN NO INO YES 3. ANY FRAMING REQUIRED FOR HVAC WORK SHALL BE BY THE GENERAL CONTRACTOR. <br /> ' 1 <br /> N <br /> - - GREASE TROUGH Y 4. GENERAL CONTRACTOR IS TO PROVIDE ANY SCREENING, GUARD RAILS, ETC. FOR ROOF <br /> A -MOUNTED HVAC <br /> I T r 500 ^--- ,- N INTERLOCK C EQUIPMENT PER IBC AND LOCAL CODES. <br /> » SEE AIR BALANCE SCHEDULE <br /> 1 <br /> r 20X18 NOTE: VERIFY ALL INFORMATION WITH MANUFACTURER PRIOR TO ORDERING 5. ANY EXPOSED HVAC WORK IN THE DINING ROOM IS TO BE PRIMED AND PAINTED BY HE GENERAL N <br /> r AND INSTALLATION <br /> CONTRACTOR. <br /> 5'-7 FRYER I i TU-1 6. GENERAL CONTRACTOR IS TO ENSURE THAT THE ROOF TRUSSES CLOSEST TO THE EXHAUST RISERS <br /> HOOD S 1 T T I FOR THE HOODS ARE SPACED 28" CENTER TO CENTER SO THAT THE EXHAUST STACKS - WHICH BY <br /> 20X20 <br /> 8$ ; , ;' {v DESIGN CANNOT BE OFFSET - WILL BE INSTALLED PLUMB. CONFIRM ON SITE WITH HVAC CONTRACTOR <br /> 1 1 ! _- MECHANICAL SYMBOLS <br /> ' F ( 100 �, 1000 1 QO + ;, ,.} i eY - _ I I AND MOST-RECENT KITCHEN EQUIPMENT HOOD PLANS <br /> 10" METAL FAB 1 1. HE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL PITCH POCKETS FOR POWER AND CONTROL WIRING <br /> DOUBLE LINED DU-T.4 , , ® ELECTRICAL CONTRACTOR <br /> 3G SERIES TO HOOD -I I 8$ A t . RTU 2 SYMBOLS DESCRIPTION <br /> 100 Q THERMOSTAT TO MAINTAIN 12 MINIMUM CLEARANCE FROM BACK PANEL OF AIR CONDITIONING UNITS AND EXHAUST <br /> # I; SUBMITTAL DATE <br /> © TEMPERATURE SENSOR <br /> FANS. ELECTRICAL CONTRACTOR SHALL NOT PENETRATE BOTTOM OF RTU CURB AND EXHAUST FANS% . <br /> 2. THE ELECTRICAL CONTRACTOR SHALL INSTALL THE CONTACTOR PANEL, ON-OFF PANEL, AND <br /> DUCT SMOKE DETECTOR <br /> _ I ® LOW-VOLTAGE CONTROL WIRING FOR ALL AIR CONDITIONING UNITS AND CONTROLS. COORDINATE AIR BUILDING DEPT: 2-15-18 <br /> o ' CONDITIONING AND ELECTRICAL PLANS. REFER TO SHEET E-5 FOR PANEL INFORMATION. FOR PROJECTS <br /> ! MANUAL BALANCING DAMPER <br /> -� WITHOUT A PANEL THE ELECTRICAL CONTRACTOR WILL INTERLOCK THE COOKING APPLIANCE AND HVAC ENGINEERING: - <br /> x <br /> C14 ® EQUIPMENT PER NFPA96. SURVEY: <br /> SUPPLY AIR GRILLE <br /> 3. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL DISCONNECTS FOR ALL HVAC EQUIPMENT. I <br /> A <br /> A 300 `2C'' 300 4. THE ELECTRICAL CONTRACTOR SHALL USE A MINIMUM OF 4'-6" SEALTTTE FLEXIBLE CONDUIT WHEN <br /> RETURN AIR GRILLE WIRING KITCHEN HOOD EXHAUST FANS ON ROOF SO THAT FANS MAY BE REMOVED FROM CURBS AND REVISIONS <br /> 300 = PLACED ON ROOF FOR CLEANING EXHAUST DUCTWORK <br /> _ A <br /> 10$ 400 ` ' N rvF' 5. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL INTERLOCK REQUIRED BY LOCAL CODE <br /> BETWEEN THE HVAC EQUIPMENT, SMOKE DETECTORS, EXHAUST FANS, AND COOKING APPLIANCES. NO. DeSCfIPtIOTI Date <br /> I , <br /> 1� Tf r ! 6. ELECTRICAL CONTRACTOR SHALL RUN LINE VOLTAGE FROM THE CURRENT SENSOR LOCATED IN THE <br /> J AIR BALANCE SCHEDULE GREASE EXHAUST FAN TO THE CONTACTOR PANEL LOCATED BY THE SWITCHGEAR. <br /> T UPP Y R <br /> OUTSIDE AI - <br /> URN X IR PRESSURE 7. FOR EACH UNIT, THE ELECTRICAL CONTRACTOR SHALL PROVIDE ONE SINGLE GANG RECEPTACLE TEST <br /> y-�-, 1 30 M 1 CFM 00 FM 1 FM STATION FOR HET STAT, AND ONE DOUBLE GANG RECEPTACLE TEST STATION FOR HE ANNUNCIATOR, <br /> WITH GREEN AND RED LIGHT INDICATORS. THE FIRE AND MECHANICAL INSPECTORS WILL DETERMINE <br /> - R - 3000 110 M 1 CF --- F <br /> SUITABLE LOCATION FOR TEST STATIONS. ANNUNCIATORS AND TEST STATION WILL BE LOOPED IN THE <br /> --- CIRCUITRY OF THE SMOKE DETECTION DEVICES. WIRING WILL BE INSTALLED BY ELECTRICAL CONTRACTOR. <br /> _ _ F-1 --- --- --- 11 CFM* - 11 0 FM <br /> 10$ 16$ 350 18$ - ". 300 - --- --- --- o CFM* - 8 --- <br /> 16X16 k PLUMBING CONTRACTOR <br /> t -3 --- --- --- 1 FM - 1 --- 1. THE PLUMBING CONTRACTOR IS TO PROVIDE AND INSTALL PITCH POCKETS FOR CONDENSATE <br /> DRAINS/GAS PIPING FOR ALL A/C UNITS AND EXHAUST FANS. PLUMBING CONTRACTOR SHALL_NQj <br /> � . T 00 0 C 0 F CF 2 0 PENETRATE BOTTOM OF RTU CURB, <br /> IF IT IS NECESSARY TO ADJUST THE AMPERAGE OF HE EXHAUST HOOD FAN MOTOR, THE FAN MOTOR TOR AMPE 2. THE PLUMBING CONTRACTOR TO COORDINATE PLUMBING VENT STACKS WITH OUTSIDE AIR INTAKES OF <br /> a 20X20 T - - - CUR ENTPSENSOON RRMUST UP VERIFY <br /> ESETTBYHTHEXELECTRICAL CONTRAC OHAUST FAN CURRENT ERSAS FOLL WSOR IS SET OADJUSTTHE OUNDERCURRENT <br /> A/C UNITS. MAINTAIN 10'-0" MINIMUM CLEARANCE OR PER LOCAL CODE. <br /> 7 4. <br /> o r <br /> INCREASE POTENTIOMETER TO UNDERCURRENTUM POT UNTIL RED IS LED MAXIMUM.) <br /> I LIGHTS. WITHIN SEVEN SECONDS ONCE <br /> TURNCURRENT <br /> DOWN UNTIL RED STABILIZED, <br /> GHT HEATER. MAINTAINPLUMBING <br /> 10'-Ow MICTOR IMUMSHORIZONTAL OR PROVIDE 3' VERTICAL CND INSTALL LEARANCLUE E TO TO REXHAUST <br /> INTAKES. FOR WATER <br /> TURNS OFF. IF A LIGHT REMAINS ON FOR MORE THAN TEN SECONDS, DISCONNECT SUPPLY VOLTAGE TO <br /> ' - l -}- - RESET. SEE MANUFACTURERS OPERATION-INSTALLATION INSTRUCTIONS THAT SHIP WITH THE FAN. WITH LIMITED <br /> - D D 10$ BUILDING PRESSURE, THE ±10% TOLERANCE IS NOT ACCEPTABLE. SET CFM AS SPECIFIED. ENSURE THAT MECHANICAL NOTES <br /> A IJ.I <br /> 350 1000 1000 <br /> 1 EXPOSED DUCTWORK SHALL BE 18 GAGE STAINLESS MEL. /y/� <br /> ,. -. �...._.__... _._._ A - _.,.... L......... i... .-....... _ iii <br /> CLEANOUTS <br /> D AT CHANGES <br /> 350 300 DIFFUSER SCHEDULE 2 DUCTWORK, AT THLEBBAS OAF VERTICAL DUCTS, INDIRECTION, <br /> AT TEVERY FLOOR INTERVALS OF VERTICAL RISERS. PROVIDE <br /> ....~ 350 SY I P RADIUS ELBOW IN EVERY CHANGE OF DIRECTION. = cc X <br /> a <br /> -1 A 4 4 P 4 S 1 T- V <br /> v „ I j J 3. FIELD APPLIED OR FACTORY BUILT GREASE DUCT ENCLOSURE SHALL BE INSTALLED PER HE LATEST ' + <br /> r 1........_. _ , 4 Y 1 - - MANUFACTURER'S INSTALLATION INSTRUCTIONS AND IN COMPLIANCE WITH TERMS OF IS LISTING. V Q <br /> rI .I I 1 P -1 " <br /> III I� 1 `0 - WHITE - 4. ALL INSTALLATIONS SHALL BE COMPLETELY ACCESSIBLE FOR VISUAL INSPECTION. <br /> 1 I {� Q <br /> -_-- _ I 1 - HI - 5. AT TIME OF INSPECTION, THE FIELD APPLIED OR FACTORY BUILT GREASE DUCT ENCLOSURE W (n <br /> 12X12 EXHAUST <br /> __.. <br /> F I..:_ ALL DIFFUSERS SHALL BE MANUFACTURED BY METAWRE OR EQUIVALENT AND 100% ALUMINUM CONSTRUCTION INSTALLATION INSTRUCTIONS SHALL BE MADE AVAILABLE AT THE JOB SITE. Z 0 <br /> i... NOTE: LOCATION AND ORIENTATION OF DIRECTIONAL BLOW PATTERN DIFFUSERS IN THE KITCHEN IS 6. LISTED GREASE HOOD ASSEMBLIES SHALL BE INSTALLED IN ACCORDANCE WITH HE TERMS OF THEIR J W <br /> F INSTALLER WILL ENSURE PROPER INSTALLATION OF DIFFUSERS. CONTACT THE NCA CONSULTANTS PROJE LISTING AND HE MANUFACTURERS INSTALLATION INSTRUCTIONS. F' <br /> COORDINATOR IMMEDIATELY WITH ANY CONFLICTS THAT PREVENT INSTALLATION PER THE PROPOSED DESIGN. Z Z Z = <br /> » PROVIDE WITH EIGHT 14"$-TO-12"0 REDUCERS FOR TOP OF DIFFUSERS 7. OWNER OF ESTABLISHMENT SHALL BE RESPONSIBLE FOR CLEANLINESS, MAINTENANCE, AND <br /> INSPECTION OF KITCHEN EXHAUST SYSTEM, FIRE PROTECTION, AND COOKING EQUIPMENT. J Y W <br /> 8. ALL SEAMS, JOINS, AND PENETRATIONS OF THE HOOD ENCLOSURE THAT DIRECT AND CAPTURE a. � O U <br /> 1111 VAC [PLAN WELD <br /> GREASE-LADEN <br /> VAPORS AND EXHAUST HE LOWER OUTERMOST GASES METER OF T E HOOD.ID TIGHT CONTINUOUS EXTERNAL ' + O T = <br /> 5CAUCi 1/4� I O 9. HOODS, FILTERS, EXHAUST FANS, AND DUCTS SHALL HAVE A CLEARANCE OF AT LEAST 18" TO Q IIm 0 00 <br /> COMBUSTIBLE MATERIALS, 3" TO LIMITED COMBUSTIBLE MATERIALS AND 0" TO NON-COMBUSTIBLE > m m Q 0 <br /> MATERIALS. = m N a .1 <br /> 10. DUCTS SHALL SLOPE NOT LESS THAN 1/4" PER LINEAL FOOT TOWARD THE HOOD OR TOWARD AN <br /> APPROVED GREASE RESERVOIR. WHERE HORIZONTAL DUCTS EXCEED 75 FEET IN LENGTH, THE SLOPE <br /> SHALL NOT BE LESS TAHN 1" PER LINEAL FOOT. <br /> 11. EXHAUST OUTLETS SERVING GREASE DUCT SYSTEMS SHALL TERMINATE ABOVE THE ROOF SURFACE, 10 DATE: 2'16'18 <br /> FEET FROM PROPERTY LINE, 10 FEET FROM AIR INTAKE OPENINGS AND 10 FEET ABOVE ADJOINING <br /> GRADE. BASE OF FAN SHALL BE 40 INCHES ABOVE ROOF SURFACE <br /> 12. INTERLOCK SUPPLY FAN SERVING KITCHEN AND KITCHEN EXHAUST FANS. SCALE: <br /> JOB CAPTAIN: <br /> ATTENTION GENERAL CONTRACTOR: "RE-ENGINEERING" DEVIATIONS FROM THE SHOWN <br /> DESIGN AND REQUIRED HVAC EQUIPMENT MUST BE APPROVED IN ADVANCE BY HE ARCHITECT' AN <br /> PROFESSIONAL ENGINEER. UNAUTHORIZED SUBSTITUTIONS OR ALTERATIONS WILL VOID THE SIGNATURE AND JOB NUMBER: <br /> j SEAL OF HE PROFESSIONAL ENGINEER AND LEAVE VIOLATORS RESPONSIBLE FOR RESUBMISSION OF j <br /> SIGNED AND SEALED DRAWINGS. <br /> I <br /> SHEET: <br /> COMM 2018, 8096011 DiGNERW, 6M. M - 1 <br /> MAR101 R\005-=91RGER 10M LODL CA\DMG\IO 1H1 HVAC KAN=02-18-21118 0416 <br />