EXISTING PACKAGE ROOFTOP UNIT SCHEDULE CONTRACTORS NOTES
<br /> HVAC CONTRACTOR
<br /> (FOR REFERENCE ONLY) 1. HE HVAC CONTRACTOR SHALL FURNISH AND INSTALL HE HVAC SYSTEM AS SHOWN IN HE NCA HVAC
<br /> EQUIPMENT PACKAGE NOTE, HIS SHEET.
<br /> T 2. THE HVAC CONTRACTOR SHALL INSTALL THE EXHAUST HOOD. REFER TO MOST RECENT KITCHEN PLANS
<br /> MANUFACTURERR ON SITE. INSTALL ALL EXHAUST DUCT PER MANUFACTURERS INSTALLATION INSTRUCTIONS, SEE SHEET M-3.
<br /> MODEL 0 7 VERIFY LOCATION ON SITE WITH MOST RECENT KITCHEN EQUIPMENT PLAN.
<br /> LOCATION. UR I OF " 4 MM/HRTYPE 3. SHIMS SHALL BE PROVIDED BY HVAC CONTRACTOR BETWEEN THE ROOF DECK AND THE CURB AS
<br /> TOTAL COOLING'F T 89. NEEDED TO COMPENSATE FOR ROOF PITCH.
<br /> SENSIBLE COOLING, 62.3 4. ALL FLEX DUCT SHALL BE FOIL-BACKED, R-8, U.L. LISTED, CLASSIFIED AS A CLASS 1 AIR DUCT, AND
<br /> ENTERING F W F 95 MEET LOCAL CODE REQUIREMENTS. ROBISON
<br /> AMBIENT AIR T 9 5. EXCLUDING ANY EXPOSED DUCTWORK, ALL NON-FLEXIBLE DUCT AND ALL AIR DISTRIBUTION DEVICES
<br /> SUPPLY IR F SHALL BE INSULATED WITH R-6, 2" X .75 DENSITY FOIL-BACKED INSULATION, WITH FIRE AND SMOKE
<br /> EXTERNAL Ar 4 RATING [25]-[50].HP ENGINEERING, INC
<br /> �- 0 6. ALL DUCTWORK SHALL BE INDEPENDENTLY HUNG FROM STRUCTURAL MEMBERS 19401 40TH AVE W.,SUITE 302
<br /> G R 11 7. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED PER SMACNA LOW-VELOCITY DUCT MANUAL LYNNWOOD,WA 98036
<br /> - -
<br /> OGAS
<br /> UTPUT (LATEST ISSUE). 206-364,3343 TEL
<br /> ! I - ; -- '--- --- �'� i1 r � UNIT W I LBS. 9 8. UNLESS OTHERWISE NOTED, EVERY SUPPLY TAP COLLAR SHALL HAVE A LOCKING MANUAL VOLUME
<br /> I H DAMPER. CONTACT:MARK MANGLICMOT
<br /> MINIMUM CIRCUIT AMPERAGE9. HE HVAC CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS ON SITE WITH THE MOST RECENT
<br /> REFLECTED CEILING PLAN.
<br /> ACCESSORIES
<br /> 1. 100% ECONOMIZER WITH BAROMETRIC RELIEF 10. THE HVAC CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE COVERING A ONE-YEAR PERIOD FOR
<br /> -- - 2. SMOKE DETECTOR ALL EQUIPMENT AND AN ADDITIONAL FOUR-YEAR PERIOD FOR THE COMPRESSORS IN THE AIR STAMP:
<br /> I '
<br /> CONDITIONING UNITS.
<br /> r 400 _,, 11. UPON COMPLETION OF PROJECT THE HVAC CONTRACTOR SHALL HIRE AN A.A.B.C. OR N.E.B.B. OF SS/
<br /> CERTIFIED,
<br /> OFNALLEHVACTTEST AND EQUIPMENT. PROVIDE A WRITTEN CE COMPANY TO CONDUCT A REPORT TO NCA CONSUL ANS. ALL CAPACITIES
<br /> CERTIFIED TEST AND e D• Rpa 9�F
<br /> FAN SCHEDULE MUST BE SET TO AMOUNTS INDICATED ON HE FLOOR PLANS AND SCHEDULES. J'Oyyc�
<br /> ,
<br /> 12. ALL FANS SHALL BE U.L. LISTED.
<br /> � I
<br /> TAG EF-1 F- F-3 w No. U-28 m
<br /> MANUFACTURER COOK COOK COOK 13. THE HVAC CONTRACTOR SHALL VERIFY LOCATIONS OF THE EXHAUST HOOD AND EF-1 FROM MOST c _
<br /> 7'-7 BROILER - MODEL 120CPS-BK100CPS-BK7 H RECENT KITCHEN EQUIPMENT PLANS ON SITE. t J=XF
<br /> OVEN HOOD 8"0 DUCT UP TO _ A ROOF ROOF ROOF 14. HVAC CONTRACTOR IS TO MAKE ALL LOW-VOLTAGE WIRING FINAL CONNECTIONS FOR ALL HVAC 1 Q
<br /> 10"0 DOUBLE LINED _.. .. -- Tq pHAN\"
<br /> EF-3 (ON ROOF") AREA ED BROILER FRYERS R EQUIPMENT INCLUDING SENSORS, THERMOSTATS, AUDIO-VISUAL ANNUNCIATORS, ROOF-TOP UNITS, SMOKE lac 04�
<br /> GREASE DUCT UP TO -- II » + DETECTORS, CONTACTOR PANEL, AND CONTROL PANEL. OF CAL\F
<br /> 10"0 DOUBLE LINED CFM lloo 800 0
<br /> 10" METAL FAB - EI-1_ (Ohl ROOF) __ GREASE DUCT UP TO STATIC PRESSURE, 1.8 " .5` 5
<br /> DOUBLE LINED DUCT, " F HORSEPOWER 1.0 GENERAL CONTRACTOR 03/01/18
<br /> --- ' 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RECEIVE, OFFLOAD, AND STORE ALL HVAC
<br /> 3G SERIES TO HOOD - 1p�1 EES (ON ROOF)
<br /> ---- 1 ' N FAN 1957 7 1500
<br /> MATERIALS WHICH ARRIVE AT HE JOB SITE HOODS MUST BE STORED IN HE KITCHEN
<br /> r 10$ t__- - 75 75 DRIVE BE DIRECT
<br /> --- ELECTRICAL REQUIREMENT, V 208-2 6 208- 1 1 6 2. IT IS VERY IMPORTANT THAT ACCURATE MEASUREMENTS ARE USED WHEN LOCATING EXHAUST FAN ROOF
<br /> - 12$ ` -
<br /> ' --- A A OPENING TO ENSURE THAT NO OFFSETS ARE REQUIRED IN HE EXHAUST DUCTWORK FROM HE KITCHEN
<br /> 1----� --------L----------- 400 C C
<br /> -
<br /> ROOF OPENING. INCHES 22 2 2 X 1 X HOOD. COORDINATE ROOF OPENINGS WITH THE KITCHEN EQUIPMENT PLAN AND EXHAUST HOOD PLANS.
<br /> � ROOF CURB YES YES YES OBTAIN THE CORRECT PLANS FROM HE KITCHEN EQUIPMENT SUPPLIER.
<br /> 50 50 BACKDRAFT DAMPER NO I YES
<br /> 10$ -- ---'---��� ,9 s BIRDS REN NO INO YES 3. ANY FRAMING REQUIRED FOR HVAC WORK SHALL BE BY THE GENERAL CONTRACTOR.
<br /> ' 1
<br /> N
<br /> - - GREASE TROUGH Y 4. GENERAL CONTRACTOR IS TO PROVIDE ANY SCREENING, GUARD RAILS, ETC. FOR ROOF
<br /> A -MOUNTED HVAC
<br /> I T r 500 ^--- ,- N INTERLOCK C EQUIPMENT PER IBC AND LOCAL CODES.
<br /> » SEE AIR BALANCE SCHEDULE
<br /> 1
<br /> r 20X18 NOTE: VERIFY ALL INFORMATION WITH MANUFACTURER PRIOR TO ORDERING 5. ANY EXPOSED HVAC WORK IN THE DINING ROOM IS TO BE PRIMED AND PAINTED BY HE GENERAL N
<br /> r AND INSTALLATION
<br /> CONTRACTOR.
<br /> 5'-7 FRYER I i TU-1 6. GENERAL CONTRACTOR IS TO ENSURE THAT THE ROOF TRUSSES CLOSEST TO THE EXHAUST RISERS
<br /> HOOD S 1 T T I FOR THE HOODS ARE SPACED 28" CENTER TO CENTER SO THAT THE EXHAUST STACKS - WHICH BY
<br /> 20X20
<br /> 8$ ; , ;' {v DESIGN CANNOT BE OFFSET - WILL BE INSTALLED PLUMB. CONFIRM ON SITE WITH HVAC CONTRACTOR
<br /> 1 1 ! _- MECHANICAL SYMBOLS
<br /> ' F ( 100 �, 1000 1 QO + ;, ,.} i eY - _ I I AND MOST-RECENT KITCHEN EQUIPMENT HOOD PLANS
<br /> 10" METAL FAB 1 1. HE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL PITCH POCKETS FOR POWER AND CONTROL WIRING
<br /> DOUBLE LINED DU-T.4 , , ® ELECTRICAL CONTRACTOR
<br /> 3G SERIES TO HOOD -I I 8$ A t . RTU 2 SYMBOLS DESCRIPTION
<br /> 100 Q THERMOSTAT TO MAINTAIN 12 MINIMUM CLEARANCE FROM BACK PANEL OF AIR CONDITIONING UNITS AND EXHAUST
<br /> # I; SUBMITTAL DATE
<br /> © TEMPERATURE SENSOR
<br /> FANS. ELECTRICAL CONTRACTOR SHALL NOT PENETRATE BOTTOM OF RTU CURB AND EXHAUST FANS% .
<br /> 2. THE ELECTRICAL CONTRACTOR SHALL INSTALL THE CONTACTOR PANEL, ON-OFF PANEL, AND
<br /> DUCT SMOKE DETECTOR
<br /> _ I ® LOW-VOLTAGE CONTROL WIRING FOR ALL AIR CONDITIONING UNITS AND CONTROLS. COORDINATE AIR BUILDING DEPT: 2-15-18
<br /> o ' CONDITIONING AND ELECTRICAL PLANS. REFER TO SHEET E-5 FOR PANEL INFORMATION. FOR PROJECTS
<br /> ! MANUAL BALANCING DAMPER
<br /> -� WITHOUT A PANEL THE ELECTRICAL CONTRACTOR WILL INTERLOCK THE COOKING APPLIANCE AND HVAC ENGINEERING: -
<br /> x
<br /> C14 ® EQUIPMENT PER NFPA96. SURVEY:
<br /> SUPPLY AIR GRILLE
<br /> 3. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL DISCONNECTS FOR ALL HVAC EQUIPMENT. I
<br /> A
<br /> A 300 `2C'' 300 4. THE ELECTRICAL CONTRACTOR SHALL USE A MINIMUM OF 4'-6" SEALTTTE FLEXIBLE CONDUIT WHEN
<br /> RETURN AIR GRILLE WIRING KITCHEN HOOD EXHAUST FANS ON ROOF SO THAT FANS MAY BE REMOVED FROM CURBS AND REVISIONS
<br /> 300 = PLACED ON ROOF FOR CLEANING EXHAUST DUCTWORK
<br /> _ A
<br /> 10$ 400 ` ' N rvF' 5. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL INTERLOCK REQUIRED BY LOCAL CODE
<br /> BETWEEN THE HVAC EQUIPMENT, SMOKE DETECTORS, EXHAUST FANS, AND COOKING APPLIANCES. NO. DeSCfIPtIOTI Date
<br /> I ,
<br /> 1� Tf r ! 6. ELECTRICAL CONTRACTOR SHALL RUN LINE VOLTAGE FROM THE CURRENT SENSOR LOCATED IN THE
<br /> J AIR BALANCE SCHEDULE GREASE EXHAUST FAN TO THE CONTACTOR PANEL LOCATED BY THE SWITCHGEAR.
<br /> T UPP Y R
<br /> OUTSIDE AI -
<br /> URN X IR PRESSURE 7. FOR EACH UNIT, THE ELECTRICAL CONTRACTOR SHALL PROVIDE ONE SINGLE GANG RECEPTACLE TEST
<br /> y-�-, 1 30 M 1 CFM 00 FM 1 FM STATION FOR HET STAT, AND ONE DOUBLE GANG RECEPTACLE TEST STATION FOR HE ANNUNCIATOR,
<br /> WITH GREEN AND RED LIGHT INDICATORS. THE FIRE AND MECHANICAL INSPECTORS WILL DETERMINE
<br /> - R - 3000 110 M 1 CF --- F
<br /> SUITABLE LOCATION FOR TEST STATIONS. ANNUNCIATORS AND TEST STATION WILL BE LOOPED IN THE
<br /> --- CIRCUITRY OF THE SMOKE DETECTION DEVICES. WIRING WILL BE INSTALLED BY ELECTRICAL CONTRACTOR.
<br /> _ _ F-1 --- --- --- 11 CFM* - 11 0 FM
<br /> 10$ 16$ 350 18$ - ". 300 - --- --- --- o CFM* - 8 ---
<br /> 16X16 k PLUMBING CONTRACTOR
<br /> t -3 --- --- --- 1 FM - 1 --- 1. THE PLUMBING CONTRACTOR IS TO PROVIDE AND INSTALL PITCH POCKETS FOR CONDENSATE
<br /> DRAINS/GAS PIPING FOR ALL A/C UNITS AND EXHAUST FANS. PLUMBING CONTRACTOR SHALL_NQj
<br /> � . T 00 0 C 0 F CF 2 0 PENETRATE BOTTOM OF RTU CURB,
<br /> IF IT IS NECESSARY TO ADJUST THE AMPERAGE OF HE EXHAUST HOOD FAN MOTOR, THE FAN MOTOR TOR AMPE 2. THE PLUMBING CONTRACTOR TO COORDINATE PLUMBING VENT STACKS WITH OUTSIDE AIR INTAKES OF
<br /> a 20X20 T - - - CUR ENTPSENSOON RRMUST UP VERIFY
<br /> ESETTBYHTHEXELECTRICAL CONTRAC OHAUST FAN CURRENT ERSAS FOLL WSOR IS SET OADJUSTTHE OUNDERCURRENT
<br /> A/C UNITS. MAINTAIN 10'-0" MINIMUM CLEARANCE OR PER LOCAL CODE.
<br /> 7 4.
<br /> o r
<br /> INCREASE POTENTIOMETER TO UNDERCURRENTUM POT UNTIL RED IS LED MAXIMUM.)
<br /> I LIGHTS. WITHIN SEVEN SECONDS ONCE
<br /> TURNCURRENT
<br /> DOWN UNTIL RED STABILIZED,
<br /> GHT HEATER. MAINTAINPLUMBING
<br /> 10'-Ow MICTOR IMUMSHORIZONTAL OR PROVIDE 3' VERTICAL CND INSTALL LEARANCLUE E TO TO REXHAUST
<br /> INTAKES. FOR WATER
<br /> TURNS OFF. IF A LIGHT REMAINS ON FOR MORE THAN TEN SECONDS, DISCONNECT SUPPLY VOLTAGE TO
<br /> ' - l -}- - RESET. SEE MANUFACTURERS OPERATION-INSTALLATION INSTRUCTIONS THAT SHIP WITH THE FAN. WITH LIMITED
<br /> - D D 10$ BUILDING PRESSURE, THE ±10% TOLERANCE IS NOT ACCEPTABLE. SET CFM AS SPECIFIED. ENSURE THAT MECHANICAL NOTES
<br /> A IJ.I
<br /> 350 1000 1000
<br /> 1 EXPOSED DUCTWORK SHALL BE 18 GAGE STAINLESS MEL. /y/�
<br /> ,. -. �...._.__... _._._ A - _.,.... L......... i... .-....... _ iii
<br /> CLEANOUTS
<br /> D AT CHANGES
<br /> 350 300 DIFFUSER SCHEDULE 2 DUCTWORK, AT THLEBBAS OAF VERTICAL DUCTS, INDIRECTION,
<br /> AT TEVERY FLOOR INTERVALS OF VERTICAL RISERS. PROVIDE
<br /> ....~ 350 SY I P RADIUS ELBOW IN EVERY CHANGE OF DIRECTION. = cc X
<br /> a
<br /> -1 A 4 4 P 4 S 1 T- V
<br /> v „ I j J 3. FIELD APPLIED OR FACTORY BUILT GREASE DUCT ENCLOSURE SHALL BE INSTALLED PER HE LATEST ' +
<br /> r 1........_. _ , 4 Y 1 - - MANUFACTURER'S INSTALLATION INSTRUCTIONS AND IN COMPLIANCE WITH TERMS OF IS LISTING. V Q
<br /> rI .I I 1 P -1 "
<br /> III I� 1 `0 - WHITE - 4. ALL INSTALLATIONS SHALL BE COMPLETELY ACCESSIBLE FOR VISUAL INSPECTION.
<br /> 1 I {� Q
<br /> -_-- _ I 1 - HI - 5. AT TIME OF INSPECTION, THE FIELD APPLIED OR FACTORY BUILT GREASE DUCT ENCLOSURE W (n
<br /> 12X12 EXHAUST
<br /> __..
<br /> F I..:_ ALL DIFFUSERS SHALL BE MANUFACTURED BY METAWRE OR EQUIVALENT AND 100% ALUMINUM CONSTRUCTION INSTALLATION INSTRUCTIONS SHALL BE MADE AVAILABLE AT THE JOB SITE. Z 0
<br /> i... NOTE: LOCATION AND ORIENTATION OF DIRECTIONAL BLOW PATTERN DIFFUSERS IN THE KITCHEN IS 6. LISTED GREASE HOOD ASSEMBLIES SHALL BE INSTALLED IN ACCORDANCE WITH HE TERMS OF THEIR J W
<br /> F INSTALLER WILL ENSURE PROPER INSTALLATION OF DIFFUSERS. CONTACT THE NCA CONSULTANTS PROJE LISTING AND HE MANUFACTURERS INSTALLATION INSTRUCTIONS. F'
<br /> COORDINATOR IMMEDIATELY WITH ANY CONFLICTS THAT PREVENT INSTALLATION PER THE PROPOSED DESIGN. Z Z Z =
<br /> » PROVIDE WITH EIGHT 14"$-TO-12"0 REDUCERS FOR TOP OF DIFFUSERS 7. OWNER OF ESTABLISHMENT SHALL BE RESPONSIBLE FOR CLEANLINESS, MAINTENANCE, AND
<br /> INSPECTION OF KITCHEN EXHAUST SYSTEM, FIRE PROTECTION, AND COOKING EQUIPMENT. J Y W
<br /> 8. ALL SEAMS, JOINS, AND PENETRATIONS OF THE HOOD ENCLOSURE THAT DIRECT AND CAPTURE a. � O U
<br /> 1111 VAC [PLAN WELD
<br /> GREASE-LADEN
<br /> VAPORS AND EXHAUST HE LOWER OUTERMOST GASES METER OF T E HOOD.ID TIGHT CONTINUOUS EXTERNAL ' + O T =
<br /> 5CAUCi 1/4� I O 9. HOODS, FILTERS, EXHAUST FANS, AND DUCTS SHALL HAVE A CLEARANCE OF AT LEAST 18" TO Q IIm 0 00
<br /> COMBUSTIBLE MATERIALS, 3" TO LIMITED COMBUSTIBLE MATERIALS AND 0" TO NON-COMBUSTIBLE > m m Q 0
<br /> MATERIALS. = m N a .1
<br /> 10. DUCTS SHALL SLOPE NOT LESS THAN 1/4" PER LINEAL FOOT TOWARD THE HOOD OR TOWARD AN
<br /> APPROVED GREASE RESERVOIR. WHERE HORIZONTAL DUCTS EXCEED 75 FEET IN LENGTH, THE SLOPE
<br /> SHALL NOT BE LESS TAHN 1" PER LINEAL FOOT.
<br /> 11. EXHAUST OUTLETS SERVING GREASE DUCT SYSTEMS SHALL TERMINATE ABOVE THE ROOF SURFACE, 10 DATE: 2'16'18
<br /> FEET FROM PROPERTY LINE, 10 FEET FROM AIR INTAKE OPENINGS AND 10 FEET ABOVE ADJOINING
<br /> GRADE. BASE OF FAN SHALL BE 40 INCHES ABOVE ROOF SURFACE
<br /> 12. INTERLOCK SUPPLY FAN SERVING KITCHEN AND KITCHEN EXHAUST FANS. SCALE:
<br /> JOB CAPTAIN:
<br /> ATTENTION GENERAL CONTRACTOR: "RE-ENGINEERING" DEVIATIONS FROM THE SHOWN
<br /> DESIGN AND REQUIRED HVAC EQUIPMENT MUST BE APPROVED IN ADVANCE BY HE ARCHITECT' AN
<br /> PROFESSIONAL ENGINEER. UNAUTHORIZED SUBSTITUTIONS OR ALTERATIONS WILL VOID THE SIGNATURE AND JOB NUMBER:
<br /> j SEAL OF HE PROFESSIONAL ENGINEER AND LEAVE VIOLATORS RESPONSIBLE FOR RESUBMISSION OF j
<br /> SIGNED AND SEALED DRAWINGS.