My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2600
>
1600 - Food Program
>
PR0544171
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 3:16:40 PM
Creation date
8/30/2019 3:25:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544171
PE
1625
FACILITY_ID
FA0025113
FACILITY_NAME
BURGER KING #25081
STREET_NUMBER
2600
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2600 REYNOLDS RANCH PKWY #100
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HVAC SYSTEMC) <br /> N • C • A <br /> GONSULTANT5 /GROUP <br /> Z <br /> STEP-4 + NATIONAL CORPORATE ACCOUNT SERVICES, INC. � <br /> 1. LOOSEN AND RELOCATE VL COLLAR TO "H" DIMENSION AS MEASURED IN DRAWINGS SHOWN ARE FOR PROTOTYPICAL. CONSIDERATIONS ONLY. SITE-SPECIFIC DESIGN IS REQUIRED <br /> STEP 1. RETIGHTEN SCREWS ON COLLAR. BY BURGER KING CORPORATION. AS A COURTESY. NCA CONSULTANTS PROVIDES SITE-SPECIFIC DESIGN <br /> (DO NOT REMOVE COLLAR FROM PIPE SECTION.) WITH SITE-SPECIFIC PROFESSIONAL ENGINEER SEAL UNDER AN AGREEMENT BETWEEN NCA CONSULTANTS O <br /> . STEP-1 AND BURGER KING CORPORATION. <br /> 2. IF NEEDED, TRIM EXCESS DUCT LENGTH TO FINISHED LENGTH OF"H"+3 FOR SITE-SPECIFIC DESIGN, ARCHITECTS EMAIL REFLECTED CEILING PLAN, ELEVATIONS, KITCHEN PLANS, <br /> A. COORDINATE WITH THE LATEST KITCHEN EQUIPMENT PLANS PRIOR TO VL COLLAR <br /> INSTALLATION OF CURB. VERIFY WITH GENERAL CONTRACTOR, FLOOR PLAN, AND ROOF STRUCTURAL PLAN TO DESIGNONCACONSULTANTS.COM Q i 0 ROBISON <br /> USING "H" LENGTH MEASURED IN STEP 2. <br /> B. MARK AND PLUMBOB THE LOCATION OF THE ROUND OPENING FROM FLOOR INNER DUCT <br /> ' TO DECK. TO CONTACT THE DESIGN DEPARTMENT BY PHONE CALL TOLL-FREE (877) 530-0078. Z <br /> C. PLACE CURB OVER OPENING BY USING DIMENSION GIVEN BELOW. H NOTE: FINISHED LENGTH OF"H"+1"(MINIMUM)UP TO"H+3" ENGINEERING, INC <br /> "H"+3" MAX. (MAXIMUM) IS ACCEPTABLE. <br /> D. WHEN GREASE FLANGE ARRIVES PLACE ON CURB WITH ROUND OVER <br /> TRANSITION DUCT 19401 40TH AVE W.,SUI 3 <br /> 02 <br /> FAN ADAPTER PLATE LYNN 9 <br /> 8036 <br /> OPENING IN DECK. <br /> 206-364364,33434 3 TEL <br /> CONTACT:MARK MANGLICMOT <br /> HVAC CONTRACTOR SHALL NOT 10 <br /> DISASSEMBLE THE EXHAUST FAN TO I am. IPIC —3G factory— Built Grease Duct <br /> RECONFIGURE THE EXHAUST DISCHARGE Installation Instructions <br /> Specific for Burger King Restaurant Installation STAMP: <br /> STEP-4b Rotate duct 1800 <br /> (Forward Discharge Assembly) QaoFEss/pN <br /> � D. <br /> FAN ADAPTER PLATE Note: These instructions have been developed in coordination for use with kitchen exhaust hood �yyc <br /> TRANSITION DUCT manufactured by Gaylord Industries. w No. -287-12R, <br /> INNER DUCT GENERAL INFORMATION <br /> VL COLLAR Metal-Fcb Model IPIC -3G grease duct is "Listed" by Underwriters Laboratories for kitchen exhaust duct FOF SFO <br /> \ `- applications for continuous operations at 500° F and intermittent operation at 2000' F. IPIC -3G is further 03/01/18 <br /> `— ROOF CURB "Classified' by Underwriters Laboratories as equivalent to a 2-hr. fire rated grease duct enclosure as per UL <br /> FLANGED CURB EXHAUST PLATE <br /> 2221 test standard and listed for Zero inch clearance to combustibles for sizes up to and including 24-inch <br /> PLAN VIEW OF ROOF CURBS inside diameter. <br /> Warning: During this installation, field application of factory-supplied insulation must be installed at joints <br /> and on Variable Length / Adustable Length components. Do not substitute insulation with other makes or <br /> STEP-5 (BROILER) THE FOLLOWING INSTRUCTIONS ARE <br /> STEP-5 (FRYER) brands. Upon completion of installation, 2 layers of 1.5-inch insulation (supplied by manufacturer) must be <br /> USED TO ALIGN THE GREASE DUCT TO <br /> THE HOOD OUTLET COLLAR. applied directly around the inner duct as described in these instructions in order to maintain the Zero-inch <br /> clearance to combustibles rating as per the manufacturer's UL listing. Crow; <br /> ROOF CURB 1. TURN THE DUCT ASSEMBLY OVER& �^ROOF CURBlie <br /> CAREFULLY SLIDE THROUGH THE FAN FOR QUESTIONS CALL METAL-FAB © 1 -800-835-2830 X 4165 <br /> CURB. <br /> STEP-2 BROILER HOOD STEP-2 (FRYER HOOD) <br /> 2. CONTINUE LOWERING THE <br /> ASSEMBLY,AS IT APPROACHES THE <br /> HOOD,ALIGN THE OUTLET COLLAR& <br /> 30' SLIP THE ASSEMBLY INTO THE <br /> ROOF CURB I-30,—� ROOF CURB METAL-FAB OUTLET COLLAR. METAL-FAB OUTLET STEP-7 SUBMITTAL DATE <br /> COLLAR 3. CHECK THE FAN ADAPTER PLATE COLLAR <br /> FOR PROPER POSITION.THE OUTSIDE ROOF CURB <br /> EDGE OF THE FAN ADAPTER PLATE BUILDING DEPT: 2-15-18 <br /> SHOULD BE APPROXIMATELY 1/4" - <br /> ENGINEERIN <br /> FROM EDGE OF ROOF CURB. SURVEY: <br /> = MEASURE DISTANCE APPROX. 61" <br /> (SHOULD BE APPROX. 58") 4. NOTE: IF THE FAN CURB NOT <br /> PROPERLY ALIGNED TO THE <br /> HOOD <br /> OUTLET COLLAR, THE FAN ADAPTOR V- COLLAR REVISIONS <br /> METAL-FAB METAL-FAB V-BAND <br /> 10' TJI PLATE CAN BE TRIMMED TO RE-ALIGN. <br /> � OUTLET COLLAR OUTLET COLLAR <br /> 1. 16 GAUGE SQUARE OFFSET ONCE ALIGNMENT IS ESTABLISHED No. Description Date <br /> 32' I PROCEED TO STEP-6 TO SEAL AND <br /> WELDED TO DISCHARGE COLLAR <br /> ASSEMBLE GREASE DUCT TO <br /> AT THE FACTORY, ON TOP OF <br /> EXHAUST HOOD. <br /> THE GAYLORD EXHAUST HOOD. <br /> METAL-FAB OUTLET COLLAR COMES <br /> FROM FACTORY WELDED INTO CAP <br /> -+ LOX - WITH CAP WELDED ONTO TOP OF <br /> O <br /> SQUARE OFFSET. <br /> BROILER LOCATE THE METAL-FAB <br /> OUTLET COLLAR POSITIONED 2. MEASURE DISTANCE FROM TOP OF <br /> ON TOP OF THE GAYLORD OUTLET COLLAR TO TOP OF ROOF <br /> CURB AS SHOWN. <br /> EXHAUST HOOD. FACTORY WELDED OFFSET TO HOOD DISCHARGE COLLAR NOTE: ALL REMAINING INSTRUCTIONS PERTAIN TO BOTH BROILER <br /> 2. MEASURE DISTANCE <br /> FROM TOP OF HOOD OUTLET EXHAUST HOOD AND FRYER EXHAUST HOOD, AS IN STEP-5. ZD <br /> COLLAR TO TOP OF ROOF CURB FRYER <br /> AS SHOWN. <br /> 1. APPLY A BEAD OF SEALANT TO V-BAND CLAMP AND ATTACH TO <br /> JOINT AS SHOWN. REF.TO STEP 3. <br /> STEP-6 <br /> J <br /> 2. TIGHTEN SCREWS ON VL COLLAR. (FOR MORE POSITIVE J Q <br /> SEAL,APPLY SEALANT TO VL COLLAR SLOT AND FLARED Q Z <br /> GREASE DUCT �+ <br /> OUT END OF COLLAR PRIOR TO TIGHTENING SCREWS.) Z <br /> ASSEMBLY SEALANT Z Z 0 V <br /> STEP-8 — a Z <br /> OC <br /> PLAIN END CALE X 4 TECH SCREWS N CC C <br /> STEP-3 APPLY THIN FILM OF SEALANT C <br /> ` ' ` ' V W <br /> 1. REMOVE THE OUTER CASING& INSULATION FROM THE VARIABLE (APPROX 1"WIDE) ROOF CURB = 0 *' <br /> LENGTH (VL)DUCT. ROOF CURB 0 <br /> UJI <br /> VL COLLAR (DO NOT DISCARD INSULATION OR CASING. IT WILL BE USED LATER). Z Z <br /> OVERLAP (ALIGN BEADS) m Z <br /> INNER DUCT 2. PLACE THE "TRANSITION DUCT/FAN ADAPTER PLATE" UPSIDE DOWN <br /> (OUTER CASING ON THE ROOF (FAN ADAPTER PLATE AGAINST ROOF). LL APPLY SEALANT VL CASING Q .Y. >. co <br /> NOT SHOWN) <br /> 3. APPLY 1/4" BEAD OF SEALANT(PROVIDED)TO FLANGE. OUTLET COLLAR FLANGE 3/4" OVERLAP CC Wdo <br /> VL COLLARSECURE W/ SCREWS J W <br /> 1, APPLY A 1/4"BEAD OF SEALANT ONTO THE FLANGE OF THE LQ 0 r <br /> INNER DUCT FLANGE I <br /> OUTLET COLLAR. (SIMILAR TO BEAD OF SEALANT USED TRIM FLUSH IF NEEDED — cc O 10 G <br /> TO ASSEMBLE DUCT SECTIONS IN STEP 3). W :3 m 111C <br /> L4. APPLY SEALANT TO INSIDE GROOVE OF V-BAND. 2, APPLY A THIN COAT OF SEALANT ABOUT 1"WIDE ON m N a J <br /> TRANSITION DUCT (THE V-BAND IS USED TO CLAMP INNER DUCT <br /> THE INNER DUCT DIRECTLY ABOVE THE FLANGE OF <br /> FLANGES TOGETHER.) THE COLLAR AS SHOWN. (NOTE: PLAIN END OF THE INNER <br /> DUCT MUST EXTEND AT LEAST 1"PAST FLANGED COLLAR). <br /> 5. SET INNER DUCT FLANGE ON TRANSITION DUCT FLANGE. DATE: 2-15-18 <br /> FAN ADAPTER PLATE 3. CAREFULLY SLIDE GREASE DUCT ASSEMBLY THROUGH 1. THE VARIABLE LENGTH (VL)CASING IS MADE UP OF(2)HALF JACKETS. <br /> THE FAN CURB AS SHOWN. LOWER ASSEMBLY INTO BUILDING, WRAP VARIABLE LENGTH (VL)CASING COMPLETELY AROUND THE INSULATED <br /> AND INSERT PLAIN END INTO OUTLET COLLAR OF HOOD. VL DUCT.THE CASING SHOULD OVERLAP THE DUCT ABOVE THE VL AS SCALE: <br /> 01 SHOWN. TRIM THE PLAIN END OF (VL)CASING SPACE IF NEEDED TO FIT THE <br /> 4. IF NEEDED, REPOSITION VL COLLAR UP AGAINST OUTLET FINISHED HEIGHT OF THE VARIABLE LENGTH (VL). OVERLAP SEAMS OF THE <br /> *SCALE <br /> COLLAR FLANGE. SEALANT SHOULD BE COMPRESSED TO HALF JACKETS BY 3/4"AND SECURE USING SCREWS PROVIDED, <br /> 1. ATTACH THE V-BAND CLAMP OVER THE INNER DUCT FORM A LIQUID TIGHT SEAL. JOB CAPTAIN: <br /> X4 FLANGES. <br /> 5. SECURE DUCT ASSEMBLY TO FAN CURB USING TECH SCREWS (NOT SUPPLIED). <br /> NOTE: WHEN ATTACHING CLAMP BAND USE A RUBBER IMPORTANT: RECTANGULAR PLATE OF DUCT ASSEMBLY MUST BE EVENLY CENTERED JOB NUMBER: <br /> MALLET(OR OTHER)TO AID IN ASSEMBLY. TIGHTEN OVER FAN CURB. BEFORE SECURING TO FAN CURB,VERIFY THAT OUTER SURFACE <br /> V-BAND CLAMP USING HEX DRIVE SCREWS PROVIDED OF GREASE DUCT MAINTAINS A MINIMUM 14NCH CLEARANCE TO COMBUSTIBLE <br /> TO COMPLETE A LIQUID TIGHT SEAL. MATERIALS. © Copyright 2015— Drawings, specifications, notes, database, <br /> 6. HVAC CONTRACTOR SHALL PROVIDE AND INSTALL HIGH TEMP SEALANT OR GASKET TO computer files, field data, and reports as instruments of service prepared by SHEET; <br /> THE OUTER PERIMETER OF THE GREASE FLANGE. the Design of Record. As instruments of services, these items remain the <br /> property of the Design of Record, who shall retain all statutory and other ! M I1 <br /> reserved rights, including the copyright thereto. Any use, reproduction or <br /> changes to these documents without written consent of NCA Consultants is a <br /> violation of federal copyright Laws. <br />
The URL can be used to link to this page
Your browser does not support the video tag.