Laserfiche WebLink
SANJ O A Q U I N Environmental Health Department <br /> —COUNTY <br /> and shall extend up the wall at least four (4) inches. Rubber or vinyl top set base is not <br /> permitted in these areas. [CRFC §114268]. <br /> 7. All manufactured and custom-made food service equipment must be certified for <br /> sanitation by an American National Standards Institute (ANSI) accredited certification <br /> program. All proposed equipment is subject to EHD approval [CRFC §114130]. <br /> 8. Provide well fitting, self-closing doors to all toilet rooms [CRFC §114276]. <br /> 9. Provide enclosed light fixtures, or shatterproof shields for light fixtures, over all areas <br /> where food is prepared, utensils cleaned, or open food is stored [CRFC §114252.1]. <br /> 10.Walls and ceilings of all rooms (except for bar areas, areas where food is stored in <br /> unopened containers, dining areas, and offices) shall be of a durable, smooth, <br /> nonabsorbent, and washable surface [CRFC §114271]. <br /> 11.All ice machines and bins, food preparation sinks, warewashing sinks (dishwashing <br /> units), display cases and refrigeration units, and any other food service equipment <br /> which discharges liquid waste, shall be drained by means of indirect waste pipes <br /> discharged through an air gap into a floor sink or other approved waste receptor. All <br /> floor sinks are to be positioned to be readily cleanable, accessible for inspections, and <br /> must be flush with finished floor. Do not place floor sinks inside walk in refrigeration <br /> units or cabinets [CRFC §114193 and §114193.1]. <br /> 12.Hot water shall be supplied at a minimum temperature of at least 120°F measured from <br /> the faucet. The water heater shall have a minimum rating of 8.6 Kw or 38,000 BTUs <br /> [CRFC §1141921. <br /> 13.The handwashing and food preparation sinks shall be separated from the warewashing <br /> sink or food preparation / storage areas by a metal splash guard, if separation is less <br /> than twenty-four (24) inches. Splash guard shall be at least six (6) inches in height <br /> from back edge to front edge [CRFC §113953]. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br /> inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $ <br /> 152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or <br /> 2 of 3 <br />