My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
455
>
2900 - Site Mitigation Program
>
PR0542310
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:01 AM
Creation date
9/3/2019 11:40:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542310
PE
2950
FACILITY_ID
FA0024297
FACILITY_NAME
SAN JOAQUIN LUMBER COMPANY
STREET_NUMBER
455
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337007
CURRENT_STATUS
01
SITE_LOCATION
455 E ELEVENTH ST
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br /> 455 E lith St <br /> Tracy,California <br /> 1.0 INTRODUCTION <br /> This Health and Safety Plan (HASP)was developed for the supplemental soil,groundwater, and <br /> soil gas sampling at the property located at 455 E 11th St in Tracy, California (the Site).This <br /> HASP was prepared by Terraphase Engineering Inc. (Terraphase)for the field investigation <br /> activities to be conducted on behalf of the confidential client. <br /> This document constitutes the HASP which is central to the safety and health program for the <br /> project.This document is considered a living document and can be amended as needed. A <br /> hardcopy of this HASP will remain on site at all times during the field work activities. <br /> 1.1 Field Work Activities <br /> Field work activities that will occur at the Site include the advancement of soil borings using a <br /> hand auger and direct push drill rig for the collection of soil and grab groundwater samples, and <br /> installation of temporary soil gas wells. Groundwater,soil, and soil gas samples will be collected <br /> during the investigation activities at the Site. <br /> 1.2 Corporate Policy <br /> Safety should take the highest priority in any Terraphase project; as evident in Terraphase's <br /> corporate motto"Safety First." It is Terraphase's policy that its personnel and its sub- <br /> contractors) on site shall assume full responsibility and liability for compliance with all <br /> applicable Federal,State and local regulations pertaining to work practices, hauling, disposal, <br /> and protection of workers,visitors to the site, and persons occupying areas adjacent to the site. <br /> Terraphase's hard-earned reputation as a successful consulting company directly correlates to <br /> our high standards for safety during our projects.The goal for safety is no illness or injuries with <br /> zero lost work days due to work conditions. <br /> Appendices Terraphase Engineering Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.