Laserfiche WebLink
i <br /> Ground Water Sampl Ing-- If ft's been over 24 hours sense The monitoring wel I was developed, <br /> S wet l volumes wl l l be removod(one well volume=the amount of water contained within <br /> the well using)before sampling the ground water. A travel blank will be provided by the <br /> Laboratory and blanks will be collected before sampling to Insure bailer or pump <br /> rleanlIness. Water samples will be collected by using either a teflon bailer ora ground <br /> water pump(bladder pump). <br /> Cleanliness--All sample equipment(split spoon sampler,brass tubes,bailer,&pumps)and <br /> auger(drl I I Ing rod,drilling bits,&auger) will be thoroughly steam cleaned before being <br /> used and between uses, <br /> Chain of Custody--A Chain of Custody(UC)form Is a legal document used to track the <br /> handling of samples. All dates,times,persons and their companies are listed from the time <br /> the sample is collected to Its ultimate disposal. A CofC farm will be failed out for all samples <br /> collected, The NC Is tracked to Insure sample integrity. <br /> SampleAnalysis--All samples will betaken to California Water Labs at the end of each <br /> sampling day, California Water Labs Is a State certified analytical labor atory located In gam, <br /> Modesto California. Soil samples will beanalyzed for total pAml hvdrocartznnfi uatnn 6X iY <br /> EPA methods 801 s(modified). For water samples,BTX and gasoline will be analyzed try <br /> X11 <br /> # EPA method 602 for the lower detection IImIis. <br /> Detection Lim Its--The detect fen limItfor diesel and gasolineare both 1 mg/kg and of) Is 10 <br /> mg/kg in soft samples. EPA method 602 has detection lfmitsof 0.5 ug/L. <br /> Data Reduction--Analytical data will be intagratedwilh the geological data gathered during <br /> field investigation. Cross sections and plan view contour maps will beprvpared to illustrate <br /> the distribul±an of sof I contamination. These cross sections and maps will be the basis for <br /> 1 <br /> Interpret Ing the extent of contem ination and for developing a remediatlon plan. <br /> Health and Safety Program <br /> ecological Technics has Incorporated the fallowing health and safety procautions while working on <br /> sites contafnfng unldentifled hazardous waste. Once the nature and extent of contamination has <br /> been determined,addfilonal worts on site will be met with the proper precautions. <br /> Workers Health and Safety <br /> I. Work Space Safety <br /> > a. The perimeter of the work space should,If possible,be 20 feet from the drilling rigor <br /> excavation site. The working perimeter will be marked 6y brfghtly_colored delineators and- <br /> -- — {�plastic tape.:All unauthorized Rersonneel were not allowed access Into the work space. <br /> b. The projact supervisor shal l coordinate al l field Octivit les and shal l maintafn the safest <br /> possible working environment atoll times. Iran emergency occurs,the supervlsor should <br /> - <br /> immediately contact the proper author)ties. <br /> c. The excavation will be roped off with bright orange tape to remind workers of the hazard <br /> present. <br /> 4 <br />