Laserfiche WebLink
s <br /> _ ! z <br /> TABLE OF CONTENTS <br /> `1 <br /> i <br /> �E <br /> 1.0 PURPOSE AND SCOPE 1 <br /> 2.0 SITE HISTORY 1 <br /> 2.1 Summary of Phase I Assesament 1 <br /> 2.2 Summazy of Tank Removal 2 <br /> 23 History of Site Monitoring 2 <br /> 14 Summary of interim Soil Remediation 2 <br /> 3.0 PROPOSED WORK PLAN 3 <br /> 3.1 Excavation Backfill 3 <br /> 3.2 New Underground Tank Installation 4 <br /> 3.3 New Ground Water Monitoring Well instatiation 4 <br /> 3.4 Interim Ground W-,,w Remediation 4 <br /> 3.4.I Calculations of Radii of Influence of Extraction Wells 5 <br /> 3.4.2 Design of Ground Water Remediation System 7 <br /> 3.4.3 Field Testing of System 7 <br /> 3.4.4 Installation and Adjustment of Complete system 8 <br /> 3.4.5 Monitoring the System g <br /> U GROUND WATER MONITORING SCHEDULE 9 <br /> 5.0 QUALITY ASSURANCE PROGRAM 9 <br /> 5.1 Equipment 9 <br /> 53-2 Seng 9 <br /> 5.4 Disposition of Soil Boxing Cuttings 10 <br /> 5.5 Monttaring Well Dtsign 10 <br /> 5.6 Monitoring Well Development 10 <br /> ' 5.7 Ground Water Sarnpling 10 <br /> 4 5.8 Cross Contaminatian Ptevention 10 <br /> 5.9 Chain of Custody I1 <br /> 5.10 Sample Analysis 11 <br /> 5.11 Detection Limits I1 <br /> 5.12 Data Reduction 11 <br /> 6.0 HEALTH AND SAFETY PROGRAM 1, <br /> 6.1 Worker's Health and Safety 11 <br /> 6.1.1 Work Space Safety 11 <br /> 6.1.2 Skin and Head Protection 12 <br /> ". 6.1.3 Face and Respiratory Protection 12 <br /> ---- ------- — ----6.2-----iiealth-and Safety Agencies---- _— 13 <br />