My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012689
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
ARCHIVED REPORTS XR0012689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:09 AM
Creation date
9/3/2019 11:55:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012689
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan <br /> Stewart's Beacon <br /> Project No.01-17.1.2 <br /> March 12,1-M <br /> Page, 4 <br /> y contamination was removed to the south and east of the excavation. Evidence for this <br /> is that contamination was not found in the soil boring on those sides of the excavation <br /> and that the excavation was extended close to those soil borings.. <br /> 3.2 New Underground Tank Inatallation <br /> SEMCO hos prepared UST installation plans which have been approved by San <br /> Joaquin County. The materials have been ordered and the tanks,lines,and pump island <br /> will be installed in quick sequence. Two 12,M gallon tanks will be used,one will be <br /> double wailed. <br /> 3.3 New Ground Water Monitoring Well Installation <br /> It is proposed to install one additional down gradient well to the north of Monitoring <br /> Well I. Since only about 40 or 59 feet exists between MW?and the north boundary of <br /> the property,it is proposed to install this new well on the property immediately to the <br /> north(Figure 5),address.113.5 Bessie Ave. <br /> Geological Technics is in the process of obtaining permission from the owner of this <br /> property. The owner is listed as Rubin&Cordova,0574 West Grantline Road,Tracy, <br /> California 95376. A]eller of request and work plan will be submitted to theta. <br /> The constriction of this well is described in section S.D. Its development and sampling <br /> procedures are also described in that section. A schematic diagram of the well design is <br /> given in Figure 4. <br /> 3.4 Interim Ground Water Remediation r <br /> After the new monitoring well has been installed,it is proposed that an interim ground <br /> water remediation program should be inRnated. the purpose of this work would be to <br /> ' remove the higher contaminated.w--�-�tlia appears to be moving past MWI before it <br /> migrates too far io the north. <br /> The methods/process of this work is outlined belvv. It should be noted that unless the <br /> plume is very limited in extent,this interim remediation will not solve the problem, <br /> but should mitigate its severity. <br /> 1. A jet pump/air stripping unit would be installed at MWl. <br /> 2. The first stage of water treatment will be air stripping, the second stage <br /> will be carbon adsorption. <br /> T3. The effluent water will be stored,_tested,_and_released_to-the_city_waste- <br /> water treatment system. Proper permitting procedures will be followed <br /> before this work is initiated. A continuous flow permit will be applied for. <br />
The URL can be used to link to this page
Your browser does not support the video tag.