Laserfiche WebLink
Y <br /> TABLE OF CONTENTS <br /> 10 INTRODUCTION 1 <br /> ' <br /> 20 BACKGROUND 1 <br /> 21 SITE LOCATION 1 <br /> 22 UST REMOVAL 1 <br /> 23 MONITORING WELL INSTALLATION AND SAMPLING 1 <br /> 24 SOIL EXCAVATION 2 <br /> 25 DISPOSAL OF HYDROCARBON IMPACTED-SOEL 3 <br /> 30 PROCEDURES 3 <br /> 31 UST INSTALLATION 3 <br /> 3 2 MONITORING WELL PURGE PROCEDURES 4 <br /> r33 COLLECTION OF GROUND WATER SAMPLES 5 <br /> 40 FINDINGS - 5 <br /> 41 LABORATORY RESULTS OF EXCAVATION SOIL SAMPLES 5 <br /> 42 LABORATORY RESULTS OF STOCKPILE SOIL SAMPLES 5 <br /> 43 ANALYTICAL RESULTS OF DE-WATERING TANK SAMPLES 5 <br /> 44 GROUND WATER GRADIENT AND DIRECTION 6 <br /> 45 LABORATORY ANALYSIS OF GROUND WATER SAMPLES 6 <br /> it <br /> 50 CONCLUSIONS AND RECOMMENDATIONS 6 <br /> 51 PETROLEUM HYDROCARBON IlVIPACTED-SOIL 6 <br /> 5 2 PETROLEUM HYDROCARBON RvIPACTED-GROUND WATER 7 <br /> 60 LIMITATIONS 7 <br /> LIST OF FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site plan <br /> Figure 3 - Excavation Sample Locations <br /> Figure 4 - Relative Ground water Elevations <br /> LIST OF TABLES <br /> Table 1 - Analytical Results of Excavation Samples <br /> Table 2 - Analytical Results of Dewatering Tank Samples <br /> Table 3 - Relative Ground Water Elevations <br /> Table 4 - Analytical Results of Ground Water Samples <br />