Laserfiche WebLink
I <br />' TABLE OF CONTENTS <br /> Page <br />' 1.0 INTRODUCTION 1 <br />' 2.0 BACKGROUND I <br />' 21 Site Location 1 <br /> 22 Tank Removal 1 <br /> 23 Initial Assessment 1 <br />' 24 Soil Excavation 4 <br /> 25 Monitoring Well Installation 4 <br /> 26 Groundwater Monitoring 4 <br /> I27 Re-excavation 4 <br /> 28 Disposal of Hydrocarbon Impacted Soil 5 <br /> 29 Excavation Backfilling 5 <br /> 3.0 PROCEDURES 5 <br /> 31 Monitoring Well Purging 5 <br /> 32 Sample Collection and Analysis 5 <br /> 4.0 FINDINGS 6 <br /> 41 Groundwater Elevation and Gradient 6 <br /> 42 Analytical Results of Groundwater Samples 8 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 8 <br /> 51 Groundwater Flow Direction and Gradient 8 <br /> 52 Petroleum Hydrocarbon Impacted Groundwater 8 <br /> 53 Petroleum Hydrocarbon Impacted Soil 8 <br /> 6.0 LIMITATIONS 10 <br />