Laserfiche WebLink
ITABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br />' 2.0 BACKGROUND 1 <br /> 21 Site Location 1 <br /> 22 Tank Removal 1 <br /> 23 Initial Assessment 1 <br /> 24 Soil Excavation 4 <br /> 25 Monitoring Well Installation 4 <br /> 26 Groundwater Monitoring 4 <br /> 27 Reexcavation 4 <br /> 28 Disposal of Hydrocarbon Impacted Soil 5 <br /> 29 Excavation Backfilling 5 <br /> 30 PROCEDURES 5 <br /> 31 Monitoring Well Purging 5 <br /> 32 Sample Collection and Analysis 6 <br />' 4.0 FINDINGS _ 6 <br /> 41 Groundwater Elevation and Gradient 6 <br /> 42 Petroleum Hydrocarbon Impacted Groundwater 6 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 8 <br /> 51 Groundwater Flow Direction and Gradient 8 <br /> 52 Petroleum Hydrocarbon Impacted Groundwater 8 <br /> 60 LIMITATIONS 10 <br /> LIST OF FIGURES <br /> Figure 1 - Location Map 2 <br /> Figure 2 - Site Plan 3 <br /> Figure 3 - Relative Elevation of Piezometnc Surface 7 <br /> LIST OF TABLES <br /> Table 1 - Relative Groundwater Elevations 6 <br /> Table 2 - Analytical Results of Water Samples 9 <br /> LIST OF APPENDICES <br /> Appendix A - Monitoring Well Data Sheets <br /> Appendix B - Analytical Results of Water Samples <br /> I <br />