Laserfiche WebLink
11/08/1996 08:57 1209B3.—52 WRIGHT ENVIRONt rAL HAUL Ub <br /> I � V <br /> Notes: <br /> 1.) "RACH" refeaCa to HACH Company Catalog, 1990 <br /> 2.) "SW" refers to the Test Methods for Evaluation Solid Waste, Physical, <br /> and Chemical Mdbods", SW-846, USEPA, 3rd edition, 1986. <br /> 3.) When mora tlian one method is provided only one method will be used. <br /> A.) Biologic screwft$ will be performed by ChromaLab or their state-approved <br /> sub-contrav;4r(s).: <br /> Task 1.5 - Report prep Ngltion: <br /> Upon completion of TAWONE Work, a report of findings of the site investigation, <br /> well installation, and sampling will be prepared. The report will include the field <br /> methods, permits, explortitpry boxing logs, elevation survey report, groundwater <br /> contour maps, groundwSW motion, chemical analytical data, physical and hydrologic <br /> data and report narrative, ::The narrative will contain a discussion of the locations and <br /> design of the groundwater-monitoring wells, and recommendations for both interim and <br /> overall remedial approm6.Vtd implementation. <br /> TASK TWO: Long-[aspii Gr0W1dwatar Monitoring: <br /> Quarterly monitoring of Me new and existing groundwater monitoring well will <br /> probably be required by 1$e PHS»ERD for at least four quarters, to establish site <br /> baseline conditions. This also gathers data for determining indigenous biodegradation <br /> conditions for statural at*wadon. Each monitoring event will include the collection of <br /> groundwater samples fres all wells related to the site for laboratory analysis as <br /> described in TASK ONE,,*W will require the preparation of a quarterly monitoring <br /> report summarizing dw re"Is of each event for submittal to the PHS-EHD. <br /> TASK THREE: STA-W.PU'ND DOCUMENT PREPARATION <br /> Task 3.1 - Budget Cogt';!!4qNuati0V: <br /> This work includes the caths associated with assisting the site owners with the <br /> preparation of and oonq*ison of budget costs associated with the work described <br /> above. <br /> Task 3.2 - Additional �D Document Preparation: <br /> Upon receipt of an apgit*:Al Ietter from the PHS-EHD, Wright will submit a pre- <br /> approval request to the 3 1tC8 UST Cleanup Fund (FUND) for implementation of the <br /> workplan, and FUND roinbursement forms as needed. <br /> Cor dr(Am ARrtPT Project No. 4090 DRAFT Page S <br />