Laserfiche WebLink
UNDERGROUND STORAGE TANK UNAUT SE ( AK)/CONTAMINATION SITE REPORT <br /> EMERGENCY HAS STATE OFFICE OF EMERGENCY SERVICES FOR LOCAL'AGENCY USE ONLY: <br /> ❑ <br /> YES - NO REPORT BEEN FILEDT ❑ YES ❑ NO 1HEREBYCEFIFYTHATI HAVE DISTRIBUTEDTHIS INFORMATION ACCORDINOTO THE <br /> REPORT DATE CASE# DISTI#IBUT[ON SHOWN ON%T�t(1 C710N SHEET.ON 7HE BACK P EOF ISFORM <br /> M MI. <br /> y SGNED '� <br /> NAMEOF NDIVIDUAL FILING REPORT <br /> PHONE - SIGNATURE <br /> w REPRESENTING <br /> ¢ ❑ OWNER/OPERATOR ❑ REGIONAL BOARD COMPANY OR AGENCY NAME <br /> O LOCAL AGENCY ❑ OTHER _ <br /> ¢ ADDRESS <br /> 3IREPf ' SY•ATE G.�/ ����/ f <br /> cm <br /> m NAME CONTACT PERSON 21° <br /> PHONE <br /> Z W ❑ UNKNOWN <br /> a Qa ADDRESS <br /> w I <br /> srReer em <br /> FACILsr�Te ITY NAME(IF APPLICABLE) 1° - <br /> 'OPERATOR •1 PHONE `�V1 <br /> ` r <br /> a ADDREErS OF <br /> w $REST <br /> m CRO STREET cm v CAVNrr� n° <br /> O LOCALAGEN "—'�AGENCY�NAME \ <br /> zJ p' 7 vow CONTACT PERSON I; PHONE Q { <br /> ww REGIONAL BOARD d <br /> a 0 PHONE <br /> NAME <br /> w QUANTITY LOST(GALLONS) <br /> ;s ���� NOWN <br /> m i (� <br /> ❑ UNKNOWN J <br /> W DATE DISCOVERED HOW DISCOVERED ❑ INVENTORY CONTROL ❑ SUBSURFACE MONITORING ❑ NUISANCE CONDIjIONS <br /> wJ M y ❑ TANK TEST ❑ TANK REMOVAL OTHER a[y ej.}-1- <br /> 1 -17-17,1G✓IGS// <br /> Q DATE DISCHARGE BEGAN METHOD USED TO STOP DISCHARGE(CHECK ALL THAT APPLY) P7[+�¢r <br /> w M D Y UNKNOWN ❑REMOVE CONTENTS E:]CLOSE TANK&REMOVE ❑REPAIR PIPING <br /> UHAS DISCHARGE BEEN STOPPED 7 ❑REPAIR TANK ❑C E TANK&FILL IN PLACE 3 <br /> y )� ❑CHANGE PROCEDURE <br /> O ❑ YES ❑ NO IF YES.DATE MI y y ❑REPLACE TANK <br /> iD SOURCE DISCHARGE CAUSE(S) <br /> tl Sej - ter <br /> �Q TANK LEAK ❑ UNKNOWN ❑ OVERFILL flUPTUREIFAILURE ❑ SPILL <br /> HO. ❑ PIPING LEAK ❑ OTHER ❑ CORROSION ❑ UNKNOWN ❑ OTHER <br /> ywa CHECKONEONLY <br /> O ❑ UNDETERMINED ❑ SOIL ONLY aROUNDWATER ❑ DRINKING WATER -(CHECK ONLY IF WATER WELLS HAVE ACTUALLY BEEN AFFECTED) <br /> CHECK ONE ONLY <br /> w ❑ NO ACTION TAKENRAINARY SITE ASSESSMENT WORKPLAN SUBMITTED ❑ POLLUTION CHARACTERIZATION <br /> �y ❑ LEAK BEING CONFIRMED PRELIMINARY SITE ASSESSMENT UNDERWAY ❑ POST CLEANUP MONITORING IN PROGRESS <br />( O ❑ REMEDIATION PLAN ❑ CASE CLOSED(CLEANUP COMPLETED OR UNNECESSARY) O CLEANUP UNDERWAY <br /> CHECK APPROPgIATE <br /> ACTION(S) <br /> I ai Ig evw rana<r� ❑ EXCAVATE&DISPOSE(ED) ❑ REMOVE FREE PRODUCT(FP) ❑ ENHANCED BIODEGRADATION(IT) <br /> } -p O ❑ CAP SITE(CD) ❑ EXCAVATE&TREAT(ET) ❑ PUMP&TREAT GROUNDWATER(GT)❑ REPLACE SUPPLY(RS) <br /> w.a ❑ CONTAINMENT BARRIER(CB) ❑ NO TION REQUIRED(NA) ❑ TREATMENT AT HOOKUP(HU) VENT SOIL(VS) <br /> 1 ¢ ❑ VACUUM EXTRACT(VE) OTHER(OT) / e� <br /> I 0 <br /> U <br /> H$C a51%9q <br />