My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
595
>
3500 - Local Oversight Program
>
PR0544793
>
ARCHIVED REPORTS XR0009987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:02 AM
Creation date
9/3/2019 1:24:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009987
RECORD_ID
PR0544793
PE
3528
FACILITY_ID
FA0006237
FACILITY_NAME
HONEST AUTO SALE AND REPAIR
STREET_NUMBER
595
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337004
CURRENT_STATUS
02
SITE_LOCATION
595 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/1712003 14 59 2094683433 FIFTH FLOOR PAGE 02 <br /> f- <br /> ENVMONMENTAL HE. Tu DEPARTMENT <br /> QUIN COUNTY 4 a v SAN JO�, U,rFRSapervtaora <br /> x.1<ieran,RA R S 304 Ee Hugu►sast weber Avenue,Third Fl= Cori gguw,Bmgan,R E , S <br /> ax pereelor MiicR E.H S R D 1. <br /> *' Al Qlaeb,R.EM-5 Stockton,Callfom"a 45242,2708 Douglas W Wilsou,R E H S, <br /> Program MOnager Telephone (209)468-3420 Nlargamt Lagorio,R,E H S <br /> i A dLaurie A Cotulla,R E H SRobert McClellan,R E H S <br /> program Manager �S1K (209)464 a13g Muk Bamelloa,RE H S <br /> Cox a Cox FILE COPY <br /> c/o JANICE B BROW <br /> 3593 ARROWHEAD DRIVE FW ST HELENA CA 94574 <br /> ISE: former Muffler Shop Site Code: 1933 <br /> 595 E. 11�'Street 110#000213 <br /> Tracy. CA., 95376 Clean Up Fund## 009444 <br /> WORK_P_LAN' "Request to Implement Interim Remedial Action (Limited <br /> Excavation MW-3& MW 9)" <br /> DATED: October 10, 2003 <br /> PREPARED BY Wright Environmental Services - Chris Palmer, HG. <br /> T$ ATUS' <br /> APPROVED,with conditions noted !below <br /> ADEQUATE UATE NECLSSARY ELE ENT OF THEW RK PLA S <br /> 25299,37, subd c 3 <br /> • Pressure grout destruction of MW-3 and MVk 4 in preparation for <br /> interim remedial action (soil ever-excavation, to --12' bgs, and <br /> groundwater dewatering) at high source areas continuing to leach <br /> into and degrade shallow groundwater and, <br /> e Temporarily store soil and groundwater at site for characterization, <br /> then transport offsite and, <br /> • import clean fill and backfill pit to existing grade and compaction <br /> and, <br /> • Submit report of findings to EHD. <br /> COMMENTS AND CON ITIPNS <br /> Cement grout pressure-destruction of contaminated monitoring <br /> wells not approved. MW-3 and MW-9 to be over bored to full depth <br /> plus I-foot (18' bgs)and grouted with non-hardening bentonite <br /> material and allowed to stand undisturbed for no less than 48 hours. <br /> No cement grout to be used for these well destructions. <br /> California UST Code of Regulations requires all corrective actions <br /> (Interim remedial action) to enter into public participation prior to <br /> final pian approval. The public is to be notified and allowed a <br /> comment period prior to enactment of the corrective action. This <br /> work plan Is tentatively approved and will be allowed to proceed <br /> once the public has had adequate time to comment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.