Laserfiche WebLink
1 V ,'LL MONITORING DATA SR_,. T <br /> Project #: D b ® _Nn S Client: W r; <br /> ,9-ampler: ,A\L S Start Date: <br /> ell I.D.: `,,� ^ Well Diameter: Q 3 4 6 8 <br /> Total Well Depth: �2.2� Depth to Water: g,10� <br /> Before: After: Before: - After: <br /> Depth to Free Product: g, C> Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D.O. Meter (if req'd): Ysl HACH <br /> Purge Method: Sampling Method: Bailer <br /> Bailer Waterra Disposable Bailer <br /> Disposable Bailers Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other: <br /> Well Diameter Multiplier Well Diameter Multi tier <br /> V. 0.04 4" 0.65 <br /> Q • to (Gals.)X _ � z" 0.16 6" 1.47 <br /> Gals. 3" 0.37 Other radius'*0.163 <br /> Temp. Conductivity <br /> Time �or °C) pH (MS Oro Turbidity (NTU) Gals. Removed Observations <br /> `l .!Sr !91 Z <br /> . o VrW <br /> Did well dewater? Yes o Gallons actually evacuated: A ,p <br /> Sampling Time: t L\t-N p Sampling Date: 4_ !8_6'3 <br /> } <br /> Sample I.D.: Laboratory: Ste' <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: Sa <br /> Equipment Blank I.D.: @ Time Duplicate I.D.: <br /> Analyzed for: TPH-G " BTEX MTBE TPH-D Other: <br /> u (ii req' <br /> a j: Pre-purge: Post-Purge: / <br /> L <br /> ORP (if req'd): Pre-purge: mV Past-purge: MV <br /> Maine Tech 'Services, Inc. 1680 Rogers Ave., Sari Jose, CA 95112 (408) 573-0555 <br /> E 9` I <br />