Laserfiche WebLink
VN ELL MONITORING DATA SR-LET <br /> Project # 0 y 1 L L 3-1S-i3 1 Client W r- L <br /> ampler---y— Start Date 11- <br /> Well I.D /.I Well Diameter Q 3 4 6 8 <br /> Total Well Depth 1 ,S-f' Depth to Water '� . ( U <br /> Before After Before After <br /> Depth to Free Product- Thickness of Free Product (feet) <br /> Referenced to Grade DO Meter (if req'd) YSI x.ACH <br /> Purge Method Sampling Method BatIer <br /> BatIer Watcrra tsposable B <br /> is aso b _ r Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Well Diameter MultiIyer Well Diameter Multi her <br /> Ar—(Gals / 1- 04- 065 <br /> )X = Gals 2" 016 16 6 6" 147 <br /> I Case Volume S ectfed Volumes Calculated Volume '- 0=f other radius.'0163 <br /> Time Temp CF) pH Cond Turbidity Gals Removed Observations <br /> 11 � Gr L 7. �-� I�G7 (01 /. J- <br /> 1 GG I 7• lot <br /> t ° G`• 7 `( in o <br /> Did well dewater? Yes ApGallons actually evacuated cl , <br /> Sampling Time { ] ? ,3 Sampling Date 1 � - 1 '3-o L <br /> Sample I D rr"-! Laboratory -S71 <br /> ,Analvzed for x-G BT" TPH-D Other d x + rr <br /> Equipment Blank I D @ rmr Duplicate I D <br /> analyzed for TPH-G BTEX MTBE TPH-D Other <br /> i <br /> (if re 'd <br /> req'd) Pre-purge mg/L/L Post-purge mg/L <br /> ORP (if req'd) Pre-purge 1mV Post-purge mV <br /> Blaine 'Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />