Laserfiche WebLink
`v v ZLL -NI GNi ORING DATA 5REz T <br /> Project-9= 67/0//7-3( l Client: <br /> Sampier: lr�b / Start Date: 7 /o J <br /> Well I.D : n'?w —7 Well Diameter: n2 3 4 6 S <br /> Total Well Depth: ( -j-pp Depth to Water: 8 _ S S <br /> Before: After.. Before: After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D 0. Meter (if req'd): YSI HACH <br /> Purge Method. Samoling Method: atIe� <br /> all; Waterra <br /> Dlsposaole Bader Peristaltic Ect=on Part <br /> Miadieourg E.:uacaonn Dedicated Tuning <br /> Ele=c Submerstaie oche- Other- <br /> Weil Diamger Multiplier Wel Diameter M—gitiniier <br /> 1' 004 4" 065 <br /> (Gals)X _ Gals 2. 016 6" 147 <br /> 1 Case Volume Saeciu'ed Vallmmes Calculated VOIume <br /> 3- 0.37 Other rad=32`0I63 <br /> Time Temp( pH Con& Turbidity Gals Removed Observations <br /> -17 <br /> /Gosh gr�4 0—fAl it <br /> Did well dewater7 Yes Gallons actually evacuated: `Z <br /> Sampling Time: /l Z 2 Sampling Date: ///7/o/ <br /> Sample I.D . IIIA-I-) — 7 Laboratory: l=,.6 <br /> Analyzed for: TPH-G B` EX MTBE TPH-D Other VXXr-EAXA-i b y SZ4,0 t !,Z f <br /> TC <br /> Equipment Blank I.D : @ rc Duplicate I.D.. <br /> Analyzed for: TPH-a 3=( MTBE TPH-D Other: <br /> OID 0. (if req'd): Pre-purge: Mg/L Post purge: "IM L <br /> �ORD, (if req a): L';e-gurgr <br /> MVI Post purge: mV <br /> Bja1ir.. , acn Services: inc: ba© Rcaers:Ave_. San-Jc-= r,A, 951.417 rdr-o` <br />