Laserfiche WebLink
i95ha%i itrh Nirtet fracc c t hebruarv1� 1994 <br /> ippro\imateh 0 003 vertical per horizontal feet According to site acuyity records the wells had not been <br /> Ssampled again until October 1993 when RRM initiated a new quarterly sampling program <br /> In October 1993 RRM performed quarterly groundwater sampling at monitor dells MWA through MW- <br /> 3 Ground%%ater samples were anahzed for TPHg and BTEX TPHg concentrations of 5,500 (5 5 ppm) <br /> and 2 900 (2 9 ppm) pans per billion (ppb)along with BTEX compounds were found at wells MW-2 and <br /> MW-3 respectively TPHg and BTEX were not detected in well MW-1 The average depth to <br /> groundwater was measured at approximately 8-feet below surface grade with an inferred groundwater flow <br /> direction to the north-east <br /> OBJECTIVES <br /> The*ectiv a of this second quarterly groundwater sampling event was to monitor the extent of petroleum <br /> hydrocarbon impacts to groundwater and to establish the current groundwater flow direction and gradient <br /> as required by the State of California Underground Storage Tank Regulations <br /> PROCEDURES <br /> Monitor wells MW-1, MW-2, and MW-3 were sampled on January 4, 1994 The locations of the wells <br /> are shown in Figure 2 Sampling activities consisted of a depth to water measurement,and then purging <br /> and sampling groundwater from each well Depth to water measurements were used to calculate the <br /> elevation of the groundwater level at each well to determine the groundwater gradient and flow direction <br /> Details of the sampling procedures are described below <br /> . 1 Measure the static depth to groundwater at each well using a Soling electronic water level <br /> indicator <br /> 2 Using a pre-cleaned Teflon bailer,purge each well a minimum of 5 well casing volumes,or until <br /> pH, conductivity, and temperature Ievels have stabilized <br /> 3 Following purging re-measure static depth to groundwater at each well to determine that <br /> groundwater has recovered to within 80%of the initial Iey el <br /> 4 Using a pre-cleaned Teflon bailer,collect a groundwater sample from each well and transfer <br /> the samples into preserved 40-m1 VOA sample vials <br /> 5 Seal and-label each sample and place into iced storage <br /> 6 Following chain of custody documentation, transport samples to a State Certified analytical <br /> laboratory <br /> All samples were submitted to Anametrix laboratories of San Jose, California for certified analyses for <br /> TPHg, and BTEX using modified EPA Methods 8015/8020 <br /> All sampling equipment was pre-cleaned before use using an Alconox soap solution and a distilled water <br /> nnse All liquid wastes denved during purging procedures were stored on-site in DOT rated 55-gallon <br /> drums contained on-site <br /> 2 <br />