EVAX Project B239-02 April 7, 1992 <br /> 1� <br /> SCOPE OF WORK <br /> The EVAX investigation consisted of the following tasks: 1) Well <br /> Installation, 2) Groundwater Sampling Event, 3) Laboratory Analyses, 4) <br /> 1 Well Elevation Survey, and 5) Report Preparation. <br /> WELL INSTALLATION <br /> Well Permit <br /> 1 The 3 groundwater monitoring wells were designated ,MW-1 through MW-3, <br /> respectively. Prior to well installation, EVAX submitted a workplan to <br /> and secured a well permit from the San Joaquin County Public Health <br /> Services, Environmental Health Division. The well permit is presented <br /> in Appendix A. EVAX also prepared a Site Safety Plan which described <br /> the basic safety guidelines for the proposed field work. Field <br /> personnel were briefed on the Site Safety Plan and a copy was available <br /> for reference. Underground Services Alert was notified to locate <br /> public underground utility lines. <br /> Well Drillers <br /> i Under contract with EVAX, Spectrum Exploration, Inc. (Spectrum: C-57 <br /> • 515662) of Stockton, California installed the groundwater monitoring <br /> wells on March 12, 1992. A California Registered Geologist for EVAX <br /> directed the well installation procedure. The 3 wells were installed <br /> in an area identified by the soil gas survey as encompassing <br /> hydrocarbon impacted soils. MW-1 and MW-2 were installed near the <br /> I north perimeter of the site, and MW-3 was installed as close as <br /> possible to the north rim of the pit of the former fuel USTs (Site <br /> Plan, Figure 2) . <br /> Spectrum used a truck mounted, Mobile CME-55 drill rig equipped with <br /> continuous flight, hollow stem augers to drill the boring of each well . <br /> I The augers were each of approximately 6-inch inside diameter and steam <br /> cleaned prior to use to avoid cross-contamination. <br /> -2- <br />