My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
612
>
3500 - Local Oversight Program
>
PR0544794
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/3/2019 2:08:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544794
PE
3528
FACILITY_ID
FA0013337
FACILITY_NAME
SOUZA II LLC (VACANT LOT)
STREET_NUMBER
612
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23439018
CURRENT_STATUS
02
SITE_LOCATION
612 W ELEVENTH ST
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Samuel Savig <br /> August 22, 2001 <br /> Page 3 of 3 <br /> immediately placed in an iced cooler and submitted to a State-certified laboratory under chain of custody <br /> protocol for analysis of TPHg, TPHd, TPHk (EPA 8015m), BTEX (EPA 8020), lead (EPA <br /> 3010/7420), and oxygenated gasoline additives (EPA 8260). The EPA 8260 scan will be expanded to <br /> include ethylene dibromide (EDB) and 1,2-dichloroethane (1,2-DCA) pursuant to Regional Board <br /> requirements. <br /> Water generated from well development and sampling will be contained in labeled DOT approved <br /> drums. The drums will be stored on site pending laboratory results and the development of disposal <br /> options. <br /> Reporting <br /> Following the receipt of analytical results, a technical report describing the methods and results of the <br /> investigation proposed herein will be submitted to PHS/EHD. The report will describe, to the degree <br /> possible, the nature and extent of contamination and will contain recommendations for additional work if <br /> appropriate. <br /> Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with Ground Zero's Quality <br /> Assurance/Quality Control Plan on file with PHS/EHD and a Site Safety Plan to be prepared prior to <br /> initiating field work. <br /> Permitting and Schedule <br /> A well construction permit and associated fees will be submitted under separate cover subsequent to <br /> approval of this workplan. It is anticipated that field work can begin within 30 days of receiving a <br /> drilling permit and a technical report can be submitted within 60 days after the completion of field work. <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments <br /> regarding this report. <br /> :r <br /> Respectfully, ��PE� GEOC <br /> Ground Zero Analysis Inc. <br /> JONP. -� <br /> J LAME <br /> ` <br /> No. 6795 <br /> John P. Lane, <br /> CA Registered Geologist No. 6795 <br /> OF CA ,'. <br /> Attachments <br /> CC' Ms. Karen Collins, Environmental Closures <br /> Mr. Marty Hartzell, CRWQCB, Central Valley Region <br /> Mr. Michael Souza, Souza II, LLC <br /> G:1Dutn1G ROUNDZMTHORPE\Souza\WPMWS.dc,c <br />
The URL can be used to link to this page
Your browser does not support the video tag.