Laserfiche WebLink
Souza II LLC -2- June 5, 2002 <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However,if costs <br /> exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the GZA proposal in my pre-approval above,please be aware <br /> that you will be entering.into a private contract:the State of California cannot compel you to <br /> sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to Include the required breakdown of costs on a bine and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all. <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at(916) 341-5796. <br /> Sincerely, <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> CaffondwFBvhD-oBmaa&1J11! otwdbvAgency <br /> Mrd RwyaWRkprr <br />