Laserfiche WebLink
WORK REQUEST FORM\ <br /> Date of Request 03/29/04 Requested Completion Date 033'04 <br /> Prot Name Souza II LLC Prod No 450 <br /> Site Address 612 West 11 in Street Tracy, CA Task <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Mike Souza Phone No 835-8330 <br /> Regulatory Contact Vicki McCartney Phone No 468-3456 <br /> Approval Lr�___5 Completion Date 3L3c�l cY As Ery <br /> READ AND UNDERSTAND THIS WORK RE UEST PRIOR TO ARRIVING ON SITE <br /> The scope of work will consist of puring and sampling three 2-inch wells Chemical hazards are <br /> asoline and BTEX see Site Safety Plan Items to bring—to-site include centrifugal -pum.13 and <br /> tubing bailers disposable sample bailers. water level probe field meters ice chest with ice <br /> Bring a drum Just in case <br /> Measure DTW/DTB in each site well in order The order is MW2 MW3 MW1 DTW should <br /> be approximately 12 - 13 feet below ground surface (bgs). and DTB should be approximately 25 <br /> feet bgs Make sure you follow our decon protocols for all downhole equipment and between <br /> wells <br /> Purge and sample wells in order The order is MW2 MW3 MW1 Wells are 2-inches in <br /> diameter and approximately 25 feet bgs Purge 3-5 casing volumes and until physical parameters <br /> fpH conductivity, tem have stabilized Make sure you follow our decon protocols for all <br /> downhole equipment and between wells You can combine purged water in a single drum All <br /> wells have veLy low levels of TPHOBTEX Pur ewater drum is to be stored in waste disposal <br /> area <br /> After the wells have stabilized sample for TPH /BTEX LEPA 8015B/8021B and oxvs (PLus <br /> EDB and 1.2-DCA) EPA 8260B Send samples to Argon Labs for analysis Write need EDF <br /> format on Chain of Custody <br /> Take a detailed drum count_Drum_s are located on the west side of the building_ near the retention <br /> basin - T <br />