Laserfiche WebLink
• Ground Zero Analysis, Inc. <br /> • SITE SAFETY PLAN <br /> Job Name Thorpe Souza 2 <br /> Job Location 612 1 V" Street, Tracy, CA <br /> Client Name Souza Realty and Development <br /> Project Number 01-450 <br /> General Work Description Advance three soil borings in vicinity of former tank pit Collect soil <br /> samples for stratigraphical and analytical concerns Install three groundwater monitoring wells <br /> SSP Prepared by John Lane <br /> On-site Safety Officer Sean Garvey <br /> Project Safety Officer John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations The SSP must be reviewed and signed by all on-site <br /> iemployees, subcontractors, and visitors prior to entering the site <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZ4 at the fob site All personnel working for GZA at the fob site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made If <br /> changes in site or working conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the <br /> written approval of the GZA Health and Safety Director <br /> PAGE 1 <br />