Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> . SITE SAFETY PLAN <br /> Site Controlnd m <br /> a Communications {Continued <br /> Off-site communications 0 Radio 0 Telephone <br /> 0 Other <br /> The specific signal for an emergency is Verbally Given <br /> I <br /> The specific signal for an evacuation is Verbally Given <br /> I <br /> Evacuation assembly point is Office building <br /> MARK EVACUATION ROUTE(S) ON SITE MAP 0 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure <br /> All contaminated personal protective equipment 0 e , gloves, coveralls) will be placed on and <br /> covered with 6-mil plastic sheeting along with the drill cuttings <br /> • Location of Wash Water At site <br /> Location of Toilet At site <br /> Location of Drinking Water At site <br /> i <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ©CHECK WHEN DONE <br /> Equipment Decontamination Procedure Equipment will be washed with a tnsodium <br /> phosphate solution and/or steamcleaned <br /> Materials to be Disposed of as Hazardous Waste All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined <br /> • I <br /> PACE 8 <br />