Laserfiche WebLink
, Staneec • • <br /> April 12,2013 <br /> Page 3 of 3 <br /> Soil cuttings and rinsate water generated during drilling operations will be temporarily stored <br /> onsite in properly labeled Department of Transportation (DOT) approved 55-gallon drums <br /> pending characterization and disposal. The soil and rinsate water will be removed by Stantec's <br /> disposal contractor to an appropriate disposal facility. The drums will be temporarily stored <br /> onsite for approximately 2-3 weeks. <br /> If you have any questions or comments regarding the contents of this work plan, please contact <br /> the undersigned at (916) 861-0400. <br /> Sincerely, <br /> Stantec Consulting Services Inc. pNAL <br /> �O CE <br /> AMANDA A <br /> � MAGEE � <br /> aelle Manning NO.am Amanda agee, P. <br /> Associate Scientist J'� ` P43D"' ��! Associate Geologis <br /> Project Manager OF 00FOQ` <br /> Attachments: Figures <br /> cc: Mr. John Wainwright, Stantec, 308 East 4500 South, Suite 100, Murray, Utah 84107-3957 <br /> 36084_phase_I I_work_plan_04_11_2013.doc <br />