My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE HISTORY CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
9/3/2019 2:29:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
FileName_PostFix
CASE 1
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION 2A <br /> ARTICLE 3, SECTION 2633/2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> CONSTRUCTION <br /> 1. Requirements; <br /> A. Approved tank construction material <br /> B. Leak interception and detection system which complies with Article 3, <br /> Section 2631(c). <br /> C. Membrane liners must comply with Article 3, Section 2633(e) , (1 ) , (2), <br /> (3) , (4) , ( 5) and are only allowed for piping systems (Department Policy) <br /> D. Demonstrate that the leak interception and detection systems protects <br /> Mround water from contamination (Article 3, Section 2633(f) , (1 ), (2) , (3) , <br /> , (5) , (6), (7). <br /> E. Pressurized piping systems must be installed with a leak detector that is <br /> capable of automatically shutting off the product pumps. <br /> 1 . Any single wall component "tank or piping" requires daily inventory <br /> rewoncilliation and annual precision tests as part of the monitoring <br /> program. <br /> F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br /> Standards. <br /> G. Before use - the tank(s) and system(s) must be tested in accordance to <br /> NFPA 329. <br /> H. Provide soil profile of vadose zone if membrane liners are used. <br /> OPTION 2B <br /> ARTICLE 3, SECTION 2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> MONITORING <br /> ✓1 . Requirements (leak interception and detection system(s)). <br /> A. Floor must be constructed on a firm base and sloped to a collection sump. <br /> B. Access casings must be installed in accordance to Article 3, Section <br /> 2634 (c) (1 thru 6), (d) (1 ). <br /> C. Submit written monitoring and response plan as stated in Article 3, <br /> Section 2634 (d) (1-3), 2634(e) (1-5). <br /> D. Hard wiring of electronic monitoring systems is required. <br /> E. Provide manufacturer's written installation instructions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.