Laserfiche WebLink
c - - <br /> x .. <br /> VERIFICATION SAMPLING OF TANK FIELD <br /> WEGE bas contracted West HazmathDrillfaot(dPp�'#i5west9oftthedrill UST <br /> and sample one roil baring UST <br /> and drill, sample and install toground2water forlthistsitetrangesof e from <br /> see Figure 3. Depth to g <br /> 11.7' to 12.9' at monitor well MWI- <br /> Starting at the 11 foot depth of each boring, samples will be <br /> obtained to top of ground water, and field screened for total <br /> volatile organic vapors using a HNu photoionizing detector with a <br /> 10,2 electron volt bulb. The sample exhibiting the highest <br /> in a response ss <br /> fres with athe luminumlbe foilCandained <br /> plastic end 2caps, thatwill <br /> sleeve, capped labeled with sample ID#, time sampled, <br /> be sealed with duck tape, <br /> date sampled and analysis ie,beseealed, The <br /> andsplaced onlicehein a <br /> placed in a Zip-Lock bagg to MATRIX Environmental <br /> cooler and transported that day <br /> Laboratories (DHS# 1676) for analysis of Total Petroleum <br /> GC FID {5030} and BTEX using <br /> Hydrocarbons Gas (TPH G) using a e 17 of Tri-Regional Board <br /> method 8020 as shown on Table #2, p g <br /> Staff Recommendation August 10, 1990. <br /> VERIFICATION OF COPTTAMINANT FREE GROUND WATER DOWN GRADIENT OF <br /> TANK FIELD. <br /> Monitor well (MW4) will be placed northeast of the tank fielusingTEX and lead, d, <br /> developed and hee imempheedsarnpled for PisGobtained, monitor wellsMW1, <br /> methods. At t <br /> MW2, and MW3 will also If laboratory analysis indicateled. All wells will be sathat the <br /> depth to ground wat a request to destroy } <br /> ground water sampled is contaminant free, <br /> all four monitor wells will be presented. <br /> WELL CONSTRUCTION <br /> the <br /> The well will be ded by GeoYEngineersWest mCt57C5drilling�) contractors <br /> supervision of Western <br /> 513857 and California Registered Geologist <br /> license nted auger rig, onch7 hollow <br /> Hazmat utilizing a truck mou <br /> stem augers, will drill to the eleven foot depth, then sample <br /> from the l samples <br /> eleven foo1edepth into top of gheuHNund wPlDrandAldescribed <br /> recovered will be field screened samples that indicate <br /> uaing'ASTM guidelines. Any reserved (stored in a zip <br /> contamination will be sealed, labeled, p nd chain of custody ice delivered to mt <br /> lock. on ice in an ichest) a the <br /> will <br /> MATRIX Laboratories lbasesofpthe boring obThese dwill also he <br /> of ground water and the <br /> preserved aand <br /> BTEXin �oncesthe boringehas beered to nAcompleted, <br /> araalytwo <br /> for TPH G sing with 0.02 inch slot will be installed <br /> inch SCH 40 F480 PVC ca <br /> from approximately the 15 foot depth to the 10 foot depth. The <br /> 10 foot deptaintssaeamachine threaded andce will be cased hsealedcwithlOnrings <br /> — - <br /> . --Teasing= -All 3 - <br /> page2 <br /> l.. <br />