Laserfiche WebLink
I <br /> 7 <br /> 7-05-SB <br /> 11TH STREET <br /> -- L` <br /> --FUEFANK-EXCAVATION-14`DEEP— <br /> TANKS AND FILL PLACEMENT 6-1-88 <br /> FIRE <br /> I HYDRANT M <br /> 37.82' 37.80' <br /> EXISTING <br /> CANOPY <br /> l u e t I a n K <br /> MW--3 <br /> I u a I 1 an k ®37.86' <br /> 9 - <br /> T <br /> H <br /> l u e l t a n k 3 7 9 0 ' <br /> S <br /> T <br /> R <br /> E <br /> E <br /> r <br /> i <br /> 38.00' <br /> II EXISTING <br /> BUILDING <br /> Ili % ODA M M W-238.09' <br /> � 38,10' <br /> 0' 5' 10' 20' 4 0 <br /> HORIZONTAL SCALE 1 . 240 1 - 20- <br /> NO TH <br /> SU9SURFAll,CE WATER GRADIENT EXPLANATION <br /> DESERT PETROLEUM <br /> SERVICE STATION *787 8.10' WATER GRADIENT <br /> 950 11th Street, Tracy, CA. GMEAN SEA LEVEL <br /> Sart Joaquln, Courtly <br /> Sec 29; T2S; RIE; MDO&M <br /> BY ® MONITOR <br /> LOCATIONWESTERN GEO-ENGINEERS <br /> George L. Converse <br /> FOR i <br /> WALTON ENGINEERING JOS* 88-2309 <br /> WEGE DATUM, <br /> Ground water measurements obtained 7-05-88 appro�tlmela Il lon <br /> last water removed Trom monitor walls prior to 01 SO loot contour <br /> measurement was 15 gallons per well on 5-01-88 89' >ant, of fire <br /> mhydrant. <br /> i <br /> II <br /> 1 <br /> Page 21 <br /> V.f <br /> I <br />