My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE INFORMATION AND CORRESPONDENCE CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:48:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Re: Circle K Store #5450 <br /> 950 1 Vh Street <br /> Tracy, California <br /> The site is located at the southeaster corner of I Ph Street and 9'h Street in Tracy, <br /> California. The site is currently an operating Circle K convenience store. To meet 1998 <br /> UST standards, secondary dispenser containment is being added to the site. <br /> In accordance with the work plan on file with San Joaquin County Public Health <br /> Department, Environmental Health Division (SJCEHD) dated February 1, 1999, the <br /> following work will be performed: <br /> 1) the removal of the gasoline dispensers; 2) sampling of soil beneath these facilities to <br /> evaluate the presence of hydrocarbons in soil at the subject site; and 3) over-excavation <br /> of hydrocarbon impacted soil to the maximum depth of 10 feet, if necessary. Applicable <br /> permits for the removal of dispensers will be obtained by Tosco's contractor prior to the <br /> start of any work. New dispensers will be installed after the existing facilities are <br /> removed. <br /> Work will be performed during weekday daylight hours. Earth moving equipment may <br /> include a backhoe, an excavator, a loader, and other equipment as appropriate. <br /> Excavated soils and debris that contains petroleum hydrocarbons will be temporarily <br /> stored onsite for a maximum of 30 days and covered with plastic sheeting prior to <br /> disposal at Forward Landfill. Excavation activities will be observed by SJCEHD and <br /> SECOR representatives. Soil samples will be collected and analyzed per SJCEHD <br /> requirements. Upon receipt of sample results, SECOR will prepare and submit to <br /> SJCEHD a letter report summarizing removal activities and sampling results. Work is <br /> anticipated to commence during February 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.