Laserfiche WebLink
u!(l C <br /> Geo1vgica[Tecfm1CS Inc. 9 t <br /> 2741 w Road <br /> Ri <br /> Moduto,CaCfo,=95351 <br /> (209)538-64241E-,#538-5852 <br /> August 20, 1997 <br /> Project No.: 8.2 <br /> Project Name: BC&D Properties (I Vh Street) <br /> Mr. Jesus Genera <br /> State Water Resources Control Board <br /> 2014 T Street, Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: Cost Pre-Approval - Site Closure <br /> BC&D Properties, 1129 W. 11th Street,Tracy,CA <br /> LOP Site Code No.; 9024; USTCFP Claim No.: TBD <br /> Dear Mr. Genera: <br /> Geological Technics Inc. (GTI) prepared a summary report dated February 28, 1997 which <br /> requested that this site be considered for closure by San Joaquin County Environmental Health <br /> Division (SJCEHD). On June 19, 1997 Ms. Margaret Lagorio of SJCEHD requested a that a <br /> work plan for site closure. <br /> On July 11, 1997 GTI prepared a site closure work plan and submitted it to Ms. Margaret <br /> Lagorio of SJCEHD. On July 16, 1997,Ms. Lagorio approved the closure plan and subsequently <br /> GTI has been obtaining costs for performing this work. <br /> Copies of the Work Plan, SJCEHD correspondence, bids and an itemized budget spread sheet of <br /> costs for performing this work are enclosed for your review. <br /> Summary of Work to Date <br /> This site has been under investigation and monitoring since 1987. Work included borehole <br /> drilling and groundwater monitoring well installation, soil and groundwater sample testing, <br /> by*geologic investigation(groundwater gradient), and report preparation. <br /> Proposed Direction of Project <br /> To close this site the primary task is to abandon the monitoring wells. The work to be performed <br /> includes the following: <br /> Well Abandonment <br /> • Work plan for this work has been submitted and approved on July 16, 1997. <br /> • There are 4 groundwater monitoring wells on this property that will be abandoned under <br /> SJCEHD permit. <br /> • Prepare a report summarizing the closure work. <br /> Listed below is a proposed schedule for implementing this project. <br />