Laserfiche WebLink
G E TT L E R - RYAN INC . WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> COMPANY LU�vlyu u ����' 's fa��,� C-��►N� t JOB # <br /> LOCATION � / S>�r-� / DATE . <br /> CITY 7V C—C TIME <br /> Well ID. <br /> � Well ConditionC <br /> Well Diameter 'r in. Hydrocarbon Thickness <br /> Total Depth ft,G Volume 2" = 0.17 6" = 1.50 127 = 5.80 <br /> Factor 3" = 0.38 8" = 2.60 <br /> Depth to Liquid— <br /> Liquid �� (VF) 4' = 0.66 10" - 4.10 <br /> cas n J �_ X _ �OV X�uF� 0�� ' =(stimgte) j ��D gal. <br /> Pur e <br /> volumes —GG Volume <br /> Purging Equipment <br /> Sampling EquipmentG. <br /> Starting Time Purging Flow Rate gPm• <br /> stimateurging Anticipated <br /> Purge gal. Flow gpm. Purging min. <br /> Volume) \Rate Time <br /> Tithe pH Conductivity Temperature Volume <br /> G Cl <br /> 7, 35 <br /> Did well dewater? If yes, time Volume <br /> Sampling Time �J Weather Conditions �/ r " Co,) <br /> Analysis ^ �� ��� _ Bottles Used <br /> ''hain of Custody Number <br /> COMUMTS <br /> FORF_MAN ASSISTANT <br />