Laserfiche WebLink
G ETT LE R - RYAN INC . WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> fry <br /> COMPANY A)m)9- (r JOB # <br /> LOCATION � DATE <br /> CITY ,�G e, t=1� TIME <br /> Well ID. /''�'l1 z Well Condition �- <br /> 1/ <br /> Well Diameter in• Hydrocarbon Thickness VC✓? ) <br /> L <br /> Total Depth jG Volume 2" = 0.17 6" = 1.50 12" = 5.80 <br /> Factor <br /> 7 3" = 0.36 8" = 2.80 <br /> Depth to Liquid— �r�� Z ft• 4" = 0.66 10" = 4.10 <br /> of 1 x y�� S� x(VF) 011 T $Purges <br /> casing J — ) gai. <br /> volumes / Volume <br /> Purging Equipment 1— �'t� LC <br /> Sampling Equipment � C1 �+► <br /> Starting Time 631 Purging Flow Rate gPm• <br /> (stimatePurging — Anticipated <br /> Purge gal. /l Flow gpm. — Purging min. <br /> Volume \ Rate // Tifne <br /> Time pH Conductivity Temperature Volume <br /> 70 �a :?7� rI _ LZ <br /> 637 J7 • l 795 'Sr <br /> -?j )_3 -7517 _P L � <br /> 7. 1L <br /> Did well dewater? N(1- _ If yes, time Volume <br /> Sampling Time CIS �`[ / _Weather Conditions Ci ' '/) <br /> Analysis L�'�-5 T Bottles Used C-V"L- { U <br /> ;Chain of Custody Number <br /> COMMENTS <br /> FOREMAN ASSISTANT <br />