Laserfiche WebLink
GE,TTLER - RYAN INC . WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> COMPANY JOB # <br /> LOCATION DATE <br /> CITY TIME <br /> Well ID. Well Condition <br /> Well Diameter in_ Hydrocarbon Thickness <br /> Total Depth Volume 2" = 0.17 6' = 1.50 12- = 5.80 <br /> Factor 3" = 0.36 8" = 2.60 <br /> Depth to Liquid-- ft (N') 4" = 0.66 10•' = 4.10 <br /> of 1 � _/�•sl.imatc <br /> (Vcolumes �` x(VF) f -Volume gal. <br /> l Volume <br /> Purging Equipment <br /> Sampling Equipment <br /> Starting Time Purging Flow hate gpm. <br /> stimate /�ur giing /Anticipated\Purgeal. Flow lJji gpm. — { Purging ] min. <br /> Volume) Rate \ Time J <br /> Time pH Conductivity Temperature Volume <br /> Did well de-water? If yes, time Volume <br /> Sampling Time Weather Conditions <br /> Analysis Bottles Used <br /> lain of Custody Number <br /> cox mrxTs <br /> FORMUN A.5S ANT <br />