Laserfiche WebLink
Limited Environmental Inves .ation Corral Hollow Tracy California <br /> Task 2.2—Soil Sample Analysis <br /> Soil samples will be transferred under strict chain-of-custody procedures to a California-certified <br /> laboratory. Samples will be analyzed for TPH-cr using EPA Method 8015 and PAHs per EPA method 8270 <br /> SIM as described above. <br /> Task 2.3—Investigation Derived Waste <br /> Investigation derived waste water(from decontamination) and soil generated during this investigation <br /> will be temporarily staged at the Site in 55-gallon drums and handled and disposed of in accordance <br /> with State and Federal requirements. Wastes will be removed from the Site no more than 60 days from <br /> the date of generation. It is assumed that all wastes will be non-hazardous. <br /> Terraphase Engineering Inc. Page 3 of 3 <br />