My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8203
>
2900 - Site Mitigation Program
>
PR0502410
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/3/2019 4:50:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0502410
PE
2960
FACILITY_ID
FA0005437
FACILITY_NAME
UNOCAL BULK PLANT #0788
STREET_NUMBER
8203
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014003
CURRENT_STATUS
01
SITE_LOCATION
8203 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA <br /> PACIFIC <br /> ENVIRONMENTAL <br /> GROUP INC. <br /> March 18, 1993 <br /> Project 310-01.04 <br /> Ms. Penny Silzer <br /> Unocal Corporation <br /> 2000 Crow Canyon Place, Suite 400 <br /> San Ramon, California 94583 <br /> Re: Unocal Bulk Plant 0788 <br /> 8203 East 11th Street <br /> Tracy, California <br /> Dear M. Silzer: . <br /> On behalf of Unocal Corporation(Unocal),Pacific Environmental Group, Inc. <br /> (PACIFIC) has prepared this remedial action plan for implementing interim <br /> remedial action at the referenced site (Figure 1). This plan presents the basis for <br /> interim remedial action development,.a description of the proposed interim <br /> remedial action, and an implementation-schedule. <br /> SITE CONDITIONS <br /> Facility Description: The site is an operating bulk plant with two 19,50 gallon <br /> and two 20,000-gallon aboveground hydrocarbon storage tanks located in the <br /> western portion of the property(Figure 2). The 19,500-gallon tanks contain diesel <br /> and super unleaded gasoline, and the 20,000-gallon tanks contain regular leaded <br /> gasoline and unleaded gasoline. According to site personnel, these tanks were <br /> installed in 1918 to replace the aboveground tanks originally installed during <br /> construction of the facility. A water-supply well, designated WSW-1, is located <br /> near the eastern property boundary.and is used for nonpotable sanitation <br /> purposes. <br /> According to site personnel, a release occurred from the underground piping <br /> between the aboveground storage tanks and the loading rack sometime during <br /> 1976 and was subsequently repaired. In 1976,separate-phase hydrocarbons were <br /> 2025 Gateway Place, Suite 440, San Jose,California 95110 (408)441-7500 FAX(408)441-7539 <br /> 620 Contra Costa Blvd.,Suite 209, Pleasant Hill,California 94523 (510)825-0855 FAX(510) 825-0882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.